Similar Projects
Major Reconstruction - CUY-East 185th Streetscape
Infrastructure
Bidding
$10,228,400 est. value
Cleveland, OH

Two Lane Resurfacing - CUY-US 6/US 20-24.44/27.78
Infrastructure
Bidding
$4,656,456 est. value
Euclid, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

West 65th Street Rehabilitation
Results
$4,495,914 est. value
Cleveland, OH 44114

East 105th Street Greenlawn Avenue to North City Limits
Results
$5,958,904 est. value
Cleveland, OH

Broadway Avenue Waterline and Roadway Improvements
Infrastructure
Bidding
Bedford, OH

Chip and Seal Oil and Labor
Infrastructure
Post-Bid
Bellefontaine, OH

Four Lane Resurfacing - West 14th Street
Results
OH

2022 Logan County Pavement Marking Program
Infrastructure
Bidding
OH

MRC Driveway
Infrastructure
Post-Bid
Cleveland, OH 44131

Microsurfacing - US-US 33-15.66
Results
Bellefontaine, OH

2022 Rocky River Crack & Joint Services
Infrastructure
Bidding
Cleveland, OH

Spot Patching / Pavement Repair - D07-PAVE-FY22
Infrastructure
Post-Bid
$1,064,870 est. value

2021-2023 Crack Sealing Program
Term Contract
Results
Shaker Heights, OH

Last Updated 03/17/2022 11:37 PM
Project Title

Miscellaneous - CUY-IR 71-05.71 Barrier

Physical Address View project details and contacts
City, State (County) Brook Park, Cleveland, Middleburg, OH (Cuyahoga, Logan Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For Improving Various Sections In The Cities Of Brook Park, Cleveland, And Middleburg Heights, Of Cuyahoga County, Ohio, In Accordance With Plans And Specifications By Replacing The Median Concrete Barrier Along i-71 From Pearl Road To The i-71/i-480 Interchange, Including All Related Items Of Work. Project Includes a Minor Amount Of Pavement Resurfacing Along The Shoulder Where The Barrier Is To Be Replaced And The Replacement Of Barrier Mounted Light Poles, Luminaires, And Conduit And Wire Necessary To Power The Lighting. Project Also Includes The Replacement Of 4 Overhead Sign Support Assemblies Section 0001 Roadway Line Item Code Item Description Unit Quantity Alt Wt 0001 202e23000 Pavement Removed (Wt: Nr) Nr Sy 159.000 0002 202e30701 Concrete Barrier Removed, As Per Plan (Wt: Nr) Nr Ft 22,042.000 0003 202e38000 Guardrail Removed (Wt: Nr) Nr Ft 50.000 0004 203e10000 Excavation (Wt: 06) 06 Cy 609.000 0005 203e20000 Embankment (Wt: 06) 06 Cy 294.000 0006 204e10000 Subgrade Compaction (Wt: 06) 06 Sy 2,119.000 0007 209e15001 Reshaping Under Guardrail, As Per Plan (Wt: 06) 06 Sta 0.880 0008 606e15050 Guardrail, Type Mgs (Wt: 36) 36 Ft 37.500 0009 606e26150 Anchor Assembly, Mgs Type e (Mash 2016) (Wt: 36) 36 Each 1.000 0010 622e10101 Concrete Barrier, Single Slope, Type b1, As Per Plan a (Wt: 38) 38 Ft 16,851.000 0011 622e10101 Concrete Barrier, Single Slope, Type b1, As Per Plan b (Wt: 38) 38 Ft 42.000 0012 622e10141 Concrete Barrier, Single Slope, Type c1, As Per Plan (Wt: 38) 38 Ft 365.000 0013 622e10200 Barrier Transition (Wt: 38) 38 Each 19.000 0014 622e10201 Barrier Transition, As Per Plan (Wt: 38) 38 Each 5.000 0015 622e25006 Concrete Barrier, End Anchorage, Reinforced, Type b1 (Wt: 38) 38 Each 133.000 0016 622e25007 Concrete Barrier, End Anchorage, Reinforced, Type b1, As Per Each 12.000 Plan (Wt: 38) 38 0017 622e25014 Concrete Barrier, End Anchorage, Reinforced, Type c1 (Wt: 38) 38 Each 3.000 0018 622e25015 Concrete Barrier, End Anchorage, Reinforced, Type c1, As Per Each 3.000 Plan (Wt: 38) 38 0019 622e41100 Portable Barrier, Unanchored (Wt: 39) 39 Ft 47,650.000 0020 622e90000 Barrier, Misc.: Concrete Barrier, Type b50 (Wt: 38) 38 Ft 26.000 0021 622e90000 Barrier, Misc.: Concrete Barrier, Type c50 (Wt: 38) 38 Ft 9.000 Section 0002 Erosion Control Line Item Code Item Description Unit Quantity Alt Wt 0022 659e00100 Soil Analysis Test (Wt: Nr) Nr Each 2.000 0023 659e00300 Topsoil (Wt: 46) 46 Cy 90.000 0024 659e10000 Seeding And Mulching (Wt: 46) 46 Sy 810.000 0025 659e14000 Repair Seeding And Mulching (Wt: 46) 46 Sy 41.000 0026 659e15000 Inter-Seeding (Wt: 46) 46 Sy 41.000 0027 659e20000 Commercial Fertilizer (Wt: 46) 46 Ton 0.110 0028 659e31000 Lime (Wt: 46) 46 Acre 0.170 0029 659e35000 Water (Wt: 46) 46 Mgal 4.380 0030 832e30000 Erosion Control (Wt: 08) 08 Each 1,000.000 Section 0003 Drainage Line Item Code Item Description Unit Quantity Alt Wt 0031 611e99101 Inlet, No. 3 For Single Slope Barrier, Type b1, As Per Plan (Wt: 35) 35 Each 59.000 0032 611e99111 Inlet, No. 3 For Single Slope Barrier, Type c1, As Per Plan (Wt: 35) 35 Each 3.000 0033 611e99155 Inlet Reconstructed To Grade, As Per Plan (Wt: 35) 35 Each 10.000 0034 611e99500 Inlet, Misc.: Inlet, No. 3b50 (Wt: 35) 35 Each 5.000 0035 611e99820 Special - Miscellaneous Metal (Wt: 35) 35 Lb 3,000.000 Section 0004 Pavement Line Item Code Item Description Unit Quantity Alt Wt 0036 254e01000 Pavement Planing, Asphalt Concrete, 1.5" (Wt: 13) 13 Sy 9,666.000 0037 254e01001 Pavement Planing, Asphalt Concrete, As Per Plan, 1.5" (Wt: 13) 13 Sy 16,301.000 0038 304e20000 Aggregate Base (Wt: 09) 09 Cy 1,538.000 0039 305e13010 9" Concrete Base, Class Qc 1p (Wt: 12) 12 Sy 186.000 0040 407e20000 Non-Tracking Tack Coat (Wt: 10) 10 Gal 2,371.000 0041 441e50300 Asphalt Concrete Intermediate Course, Type 2, (448), 4" (Wt: 10) 10 Cy 21.000 0042 441e50701 Asphalt Concrete Intermediate Course, Type 1, (448), (Under Cy 4.000 Guardrail), As Per Plan (Wt: 10) 10 0043 442e10301 Asphalt Concrete Surface Course, 12.5 Mm, Type a (447), As Per Cy 688.000 Plan, Pg76-22m, 1.5" (Wt: 10) 10 0044 442e20001 Asphalt Concrete Surface Course, 12.5 Mm, Type a (448), As Per Cy 403.000 Plan, Pg70-22m, 1.5" (Wt: 10) 10 0045 618e40600 Rumble Strips, Shoulder (Asphalt Concrete) (Wt: Nr) Nr Mile 6.590 Section 0005 Lighting Line Item Code Item Description Unit Quantity Alt Wt 0046 625e00450 Connection, Fused Pull Apart (Wt: 43) 43 Each 88.000 0047 625e00460 Connection, Unfused Pull Apart (Wt: 43) 43 Each 77.000 0048 625e00480 Connection, Unfused Permanent (Wt: 43) 43 Each 100.000 0049 625e10495 Light Pole, Low Mast, As Per Plan, Alm50 (Wt: 43) 43 Each 88.000 0050 625e14306 Median Light Pole Foundation, 10' Deep (Wt: 43) 43 Each 2.000 0051 625e14307 Median Light Pole Foundation, 10' Deep, As Per Plan a (Wt: 43) 43 Each 72.000 0052 625e14307 Median Light Pole Foundation, 10' Deep, As Per Plan b (Wt: 43) 43 Each 1.000 0053 625e14600 Light Pole Foundation, Misc.: Median Foundation On Spread Footer Each 9.000 (Wt: 43) 43 0054 625e15201 Light Tower Foundation, 36" x 25' Deep, As Per Plan (Wt: 43) 43 Each 1.000 0055 625e15301 Light Tower Foundation, 36" x 30' Deep, As Per Plan (Wt: 43) 43 Each 1.000 0056 625e23200 No. 4 Awg 2400 Volt Distribution Cable (Wt: 43) 43 Ft 61,187.000 0057 625e23400 No. 10 Awg Pole And Bracket Cable (Wt: 43) 43 Ft 15,400.000 0058 625e24320 1-1/2" Duct Cable With Three No. 4 Awg 2400 Volt Cables (Wt: 43) 43 Ft 50.000 0059 625e26273 Luminaire, Low Mast, Solid State (Led), As Per Plan, 3000k, 47000 Each 88.000 Lumen (Wt: 43)43 0060 625e29002 Trench, 24" Deep (Wt: 43) 43 Ft 160.000 0061 625e29931 Median Junction Box, As Per Plan b (Wt: 43) 43 Each 18.000 0062 625e29931 Median Junction Box, As Per Plan c (Wt: 43) 43 Each 32.000 0063 625e30700 Pull Box, 725.08, 18" (Wt: 43) 43 Each 2.000 0064 625e30711 Pull Box, 725.08, 32", As Per Plan (Wt: 43) 43 Each 24.000 0065 625e32000 Ground Rod (Wt: 43) 43 Each 87.000 0066 625e35021 Re-Erect Existing Light Tower, As Per Plan (Wt: 43) 43 Each 2.000 0067 625e40000 Special - Maintain Existing Lighting (Wt: 43) 43 Ls 1.000 0068 625e75400 Light Pole Removed (Wt: Nr) Nr Each 88.000 0069 625e75506 Luminaire Removed (Wt: Nr) Nr Each 176.000 0070 625e75800 Disconnect Circuit (Wt: Nr) Nr Each 1.000 0071 625e98200 Lighting, Misc.: Light Pole Identifiers (Wt: Nr) Nr Ls 1.000 0072 809e24000 Conduit, Multicell, Jacked Or Drilled, 4" (Wt: 55) 55 Ft 3,780.000 0073 809e24500 Conduit, 4", Multicell, Hdpe With 4 ? 1? Innerducts (Wt: 55) 55 Ft 240.000 Section 0006 Traffic Control Line Item Code Item Description Unit Quantity Alt Wt 0074 620e00500 Delineator, Post Ground Mounted, Type c (Wt: Nr) Nr Each 1.000 0075 625e29931 Median Junction Box, As Per Plan a (Wt: 43) 43 Each 2.000 0076 626e00102 Barrier Reflector, Type 1, One Way (Wt: Nr) Nr Each 442.000 0077 626e00110 Barrier Reflector, Type 2, One Way (Wt: Nr) Nr Each 2.000 0078 630e72411 Overhead Sign Support, Type Tc-15.116, Design 1, As Per Plan (Wt: 42) 42 Each 2.000 0079 630e72421 Overhead Sign Support, Type Tc-15.116, Design 2, As Per Plan (Wt: 42) 42 Each 2.000 0080 630e79500 Sign Support Assembly, Pole Mounted (Wt: 42) 42 Each 2.000 0081 630e79610 Sign Support Assembly, Barrier Mounted (Wt: 42) 42 Each 38.000 0082 630e80100 Sign, Flat Sheet (Wt: 42) 42 Sf 180.000 0083 630e84010 Concrete Barrier Median Overhead Sign Support Foundation, Type Each 4.000 Tc-21.50 (Wt: 42) 42 0084 630e84510 Rigid Overhead Sign Support Foundation (Wt: 42) 42 Each 4.000 0085 630e85100 Removal Of Ground Mounted Sign And Reerection (Wt: 42) 42 Each 16.000 0086 630e87100 Removal Of Overhead Mounted Sign And Reerection (Wt: 42) 42 Each 18.000 0087 630e89802 Removal Of Overhead Sign Support And Disposal, Type Tc-7.65 (Wt: Each 4.000 Nr)Nr 0088 646e10010 Edge Line, 6" (Wt: 45) 45 Mile 19.420 0089 646e10110 Lane Line, 6" (Wt: 45) 45 Mile 18.440 0090 646e10310 Channelizing Line, 12" (Wt: 45) 45 Ft 8,482.000 0091 646e10620 Chevron Marking (Wt: 45) 45 Ft 327.000 0092 646e20504 Dotted Line, 6" (Wt: 45) 45 Ft 5,885.000 0093 646e20510 Dotted Line, 12" (Wt: 45) 45 Ft 2,285.000 Section 0007 Maintenance Of Traffic Line Item Code Item Description Unit Quantity Alt Wt 0094 614e11110 Law Enforcement Officer With Patrol Car For Assistance (Wt: 39) 39 Hour 300.000 0095 614e12380 Work Zone Impact Attenuator, 24" Wide Hazards, (Unidirectional) Each 10.000 (Wt: 39) 39 0096 614e12484 Work Zone Increased Penalties Sign (Wt: 39) 39 Each 20.000 0097 614e12800 Work Zone Raised Pavement Marker (Wt: 39) 39 Each 1,613.000 0098 614e13000 Asphalt Concrete For Maintaining Traffic (Wt: 39) 39 Cy 25.000 0099 614e13310 Barrier Reflector, Type 1, One Way (Wt: Nr) Nr Each 957.000 0100 614e13350 Object Marker, One Way (Wt: Nr) Nr Each 953.000 0101 614e18601 Portable Changeable Message Sign, As Per Plan (Wt: 39) 39 Snmt 12.000 0102 614e20110 Work Zone Lane Line, Class i, 6", 642 Paint (Wt: 39) 39 Mile 15.620 0103 614e22110 Work Zone Edge Line, Class i, 6", 642 Paint (Wt: 39) 39 Mile 16.990 0104 614e23210 Work Zone Channelizing Line, Class i, 12", 642 Paint (Wt: 39) 39 Ft 15,994.000 0105 614e24202 Work Zone Dotted Line, Class i, 6", 642 Paint (Wt: 39) 39 Ft 7,661.000 0106 630e97800 Signing, Misc.: Additional Signs, Ground Mounted, As Directed By Sf 300.000 The Engineer (Wt: 42) 42 0107 808e18700 Digital Speed Limit (Dsl) Sign Assembly (Wt: 39) 39 Snmt 108.000 Section 0008 Incidentals Line Item Code Item Description Unit Quantity Alt Wt 0108 103e05000 Premium For Contract Performance Bond And For Payment Bond Ls 1.000 (Wt: Nr) Nr 0109 108e30000 Cpm Progress Schedule Short Duration Projects (Wt: Nr) Nr Ls 1.000 0110 614e11000 Maintaining Traffic (Wt: 39) 39 Ls 1.000 0111 619e16011 Field Office, Type b, As Per Plan (Wt: Nr) Nr Mnth 6.000 0112 623e10001 Construction Layout Stakes And Surveying, As Per Plan (Wt: Nr) Nr Ls 1.000 0113 624e10000 Mobilization (Wt: Nr) Nr Ls 1.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents