Similar Projects
Finish Site Plan Work for New Marina Office
New Construction, Infrastructure
Conception
$116,643 CJ est. value
Islamorada, FL 33036

Finish Site Plan Work for New Marina Office
New Construction, Infrastructure
Conception
$116,643 CJ est. value
Islamorada, FL 33036

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Generator Building - Monroe County Sheriffs Office
New Construction, Infrastructure - 5,161 SF
Design
$1,000,000 CJ est. value
Key West Nas, FL 33040

Trumbo Affordable Workforce Housing
New Construction, Infrastructure
Bidding
$8,000,000 CJ est. value
Key West Nas, FL 33040

Asphalt Repairs
Infrastructure
Bidding
$750,000 CJ est. value
East Rockland Key, FL 33040

Diesel Pump Upgrades at J. Robert Dean Water Treatment Plant
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Florida City, FL 33034

Fishermen's Community Hospital - Medical Arts Building
New Construction, Infrastructure - 9,990 SF
Post-Bid
$3,000,000 CJ est. value
Marathon, FL 33050

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

CFX Systemwide Facilities Maintenance Services
Renovation, Term Contract, Alteration
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

1319 William Street Residential
New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Key West Nas, FL 33040

Duck Avenue Supportive Housing Development
New Construction, Infrastructure, Renovation
Pending Verification
$40,600,000 CJ est. value
Key West Nas, FL 33040

Sombrero Beach Sand Renourishment - City of Marathon
Infrastructure
Conception
$416,000 CJ est. value
Marathon, FL 33050

Beach Store - Marathon Key
New Construction, Infrastructure
Design
$9,000,000 CJ est. value
Marathon, FL 33050

Last Updated 10/03/2023 01:07 PM
Project Title

Welcome Center Railings Project

Physical Address View project details and contacts
City, State (County) Marathon, FL 33050   (Monroe County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

The Dolphin Research Center is seeking sealed bids from qualified Contractors to provide all labor and materials to complete the replacement of the railings for the decks, ramps and stairs on the exterior of our Welcome Center Building as soon as possible thereafter. Dolphin Research Center is postponing the bids. A firm timeline for advertising of a new bid date has not yet been determined.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents