Similar Projects
2018 Bond Year 3, Contract 9
Bidding
Fort Worth, TX 76112

RM2871 - Resurface Roadway
Bidding
$1,021,821 est. value
TX

1400-1500 Blks Byrd Drive, Street Improvements
Post-Bid
Less than $256,970 est. value
Fort Worth, TX 76114

CIP Improvements Hackamore Street – Sewer, Water & Paving Replacement
Post-Bid
$600,000 est. value
White Settlement, TX 76108

Southern Region Disaster Recovery Support BPA
Results

Parker Henderson Road from Mansfield Highway (BUS.287) to Kellis Street
Results
Fort Worth, TX 76102

2020 Street Mill, Overlay at Various Locations
Post-Bid
Bedford, TX 76021

Rehabilitation of Existing Road
Results
Less than $339,106 est. value
TX

Concrete and Asphalt Repair Services
Term Contract
Post-Bid
Arlington, TX 76019

2020 Brick Pavement Rehabilitation at Various Locations
Results
Fort Worth, TX 76102

FY2019 CIP Improvements Tumbleweed Trail Sewer, Water and Paving Replacement
Post-Bid
Less than $1,800,000 est. value
White Settlement, TX 76108

2020 Concrete Restoration Contract 2 at Various Locations
Results
Fort Worth, TX 76102

Asa Low Intermediate School Access Driveway
Post-Bid
$400,000 to $500,000 est. value
Mansfield, TX 76063

Construct New Roadway Lanes
Results
Less than $24,495,819 est. value
TX

Somerset Phase 3 Paving Improvements
Post-Bid
Mansfield, TX 76063

Last Updated 02/01/2021 09:05 AM
Project Title

2018 Bond Year 3, Contract 7

Physical Address View project details and contacts
City, State (County) Fort Worth, TX   (Tarrant County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of water and/or sanitary sewer mains and paving improvements on the following streets - Ellis Road from Muse Street to Sandy Lane Kings Hwy from Fain Street to Wheeler Street Oakview Street from Marsalis Street to Airport Freeway Seaman Street from E. Belknap Street to Clary Avenue Selma Street from Brittain Street to N. Beach Street Major work items include: 19,410 SY asphalt pavement (Alternate A) 10,601 LF concrete curb and gutter (Alternate A) Or 21,689 SY concrete pavement (Alternate B) And 3214 LF 6” to 12” water pipe 2520 LF 8” to 18” sewer pipe

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents