Last Updated 06/18/2020 11:59 PM
Project Title

Eastside Non-Copper Service Replacement

Physical Address View project details and contacts
City, State (County) Kalamazoo, MI 49007   (Kalamazoo County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: New access shaft at the ITC corridor, 15 Mile Road west of Schoenherr in Sterling Heights, MI. PCI-12A in-system sediment removal from the ITC corridor upstream to the 8-foot diameter bypass reach (PCI-37). Slip-lining PCI-12A from the ITC corridor to the 8-foot diameter bypass reach (PCI-37). Structural spray lining of the remaining portion of the PCI-37 8-foot bypass reach.

Details

Division 26 - Electrical.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents