Similar Projects
High Point Road Pedestrian Crossing - City of Sandy Springs
Infrastructure
Conception
$330,000 est. value
Sandy Springs, GA 30342

Altamaha Trading Company
New Construction, Infrastructure
Conception
$3,000,000 est. value
Brunswick, GA 31525

Canal Road Widening Project FY22
Infrastructure
Design
$500,000 CJ est. value
Brunswick, GA 31525

West Lake Commons Mixed Use Development
New Construction, Infrastructure - 33,000 SF
Design
$10,000,000 CJ est. value
Martinez, GA 30907

Firefly Trail Southern Segment Phase 1
Infrastructure
Bidding
$2,800,000 est. value
Greensboro, GA

Main Street Enhanced Sidewalk - Phase I
Infrastructure
Bidding
$200,000 est. value
Duluth, GA 30098

Blakely Gateway Project
Post-Bid
$500,000 est. value
Blakely, GA 31723

MWA Third Street Parking, Third Street at Arch Street
Post-Bid
Macon, GA

Baymeadows Drive Pedestrian Improvements
Results
Less than $274,869 est. value
Valdosta, GA 31601

Mott's Green Plaza P. I. #0015287
Results
Columbus, GA 31902

Sr 10 / Us 278 Fm Cs 721 / Ashton Place To Cr 5206 / Sams Crossing
Alteration
Design
$5,000,000 est. value
Avondale Estates, GA 30002

2021 Metter CDBG
Infrastructure
Bidding
$917,532 CJ est. value
Metter, GA 30439

Re-Surfacing and Improved Lighting of the Terminal Station Parking Lot
Post-Bid
Macon, GA 31206

Redwine and Starrs Mill School Complex Multi-Use Path
Results
Woolsey, GA 30214

East College Avenue Mixed-Use Development
New Construction, Infrastructure - 18,000 SF
Design
$30,000,000 est. value
Decatur, GA

Reported 07/27/2022 12:00 AM
Project Title

Main Street Sidewalk

Physical Address View project details and contacts
City, State (County) Cornelia, GA 30531   (Habersham County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Any proposal received after said time and date will not be considered by the Owner. No proposal may be withdrawn after the closing time for the receipt of proposals for a period of sixty (60) days except as specifically may be provided by State law. The work to be completed shall consist of furnishing all labor, equipment, and materials necessary to install +-130 LF concrete sidewalk and curb and gutter, and +-75 LF handrail complete with demolition, pavement removal and replacement and all appurtenances necessary to provide a complete installation as shown in the Appendix.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents