Similar Projects
Road Work - Pinckney Street Drainage Project TST
Infrastructure
Bidding
Charleston, SC 29401

Road Work - Scotia Street Drainage CTC
Infrastructure
Bidding
McClellanville, SC 29458

Phase 3 Internal Drainage Improvements
Post-Bid
Isle of Palms, SC 29451

Fretwell Street Drainage Improvements
Post-Bid
North Charleston, SC 29406

Grimball Road Drainage Improvements
Results
SC

Construction Services Low Battery Restoration Project - Phase II
Results
Charleston, SC 29401

Van Buren Avenue Drainage Improvements And Water Main Improvements
Infrastructure
Bidding
North Charleston, SC 29406

Folly River Park Retaining Wall
Infrastructure
Post-Bid
Folly Beach, SC 29439

Royall Avenue Drainage Improvements
Results
Mount Pleasant, SC 29464

Dorchester Road Drainage Improvements
Results
$467,620 est. value
North Charleston, SC 29418

34th and Hartnett Drainage Project
Results
Isle of Palms, SC

Ashley Point Drainage Improvements
Infrastructure
Results
$109,782 est. value
Charleston, North Charleston, SC 29407

Forest Hills Pipe Lining
Infrastructure
Results
$922,127 est. value
North Charleston, SC

On-Call Ditch Digging Services for Various Locations
Infrastructure
Results
Mount Pleasant, SC

Coral Reef Drive Drainage Improvement Project
Infrastructure
Results
Charleston, SC

Last Updated 01/07/2022 12:04 PM
Project Title

Medical District Drainage Tunnel Extension at Ehrhardt Street

Physical Address View project details and contacts
City, State (County) Charleston, SC 29425   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a stormwater tunnel and drop shaft structure that will service a portion of the Medical District. The Ehrhardt Tunnel will be connected to the Spring Fishburne US 17 Drainage Tunnel System at the existing Cannon Street Shaft. Construction includes one 54-inch outside diameter steel drilled drop shaft to a depth of approximately 140 feet below grade; a concrete vortex structure; a concrete bulkhead in an existing tunnel; approximately 900 feet of 8-feet inside diameter cast-in-place concrete tunnel; installation of surface drainage collection piping and structures; and all other associated activities.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents