Similar Projects
Infrastructure Improvements Projects-Construction Qualifications
Term Contract
Bidding
Southfield, MI

2021 SAD Repair Program
Infrastructure
Bidding
MI

Cold Patch-High Performance, Annual Estimated Quantities
Term Contract
Post-Bid
Beverly Hills, MI

Maintenance Concrete Patching Program
Post-Bid
Beverly Hills, MI

Maintenance Modified Hand Patching Program
Results
Beverly Hills, MI

Structural Foundation Assessment for Police Facility
Results
Less than $35,550 est. value
Farmington Hills, MI

2020 Road Program
Post-Bid
Bloomfield Hills, MI

Ready Mix Concrete Materials
Results
Rochester Hills, MI

FMO: Asphalt and Concrete Maintenance and Repair - M
Term Contract
Post-Bid
Waterford, MI 48328

0.38 MI of Road Rehabilitation, Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb and Gutter, Drainage, Structure adjustments, Signing and Pavement Markings
Results
Ferndale, MI 48220

Cement, Annual Estimated Quantities
Post-Bid
Waterford, MI 48328

Peters Road Improvements
Results
Milford, MI

District Wide Site Improvements
Post-Bid
West Bloomfield, MI 48323

Stonewood Court Road Rehabilitation Project
Results
Farmington Hills, MI

Asphalt Emulsion, Annual Estimated Quantities
Post-Bid
Beverly Hills, MI 48025

Last Updated 07/14/2021 04:20 PM
Project Title

Vanguard Drive Compacted Concrete Project

Physical Address View project details and contacts
City, State (County) Pontiac, MI 48341   (Oakland County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project calls for utilization of compacted concrete pavement, which is placed with a high density paver. Contractors who do not have access to a high density paver should not pursue this project. This project is being bid for the removal and replacement of the concrete pavement along Vanguard Drive starting at the edge of Telegraph Road to 637 feet east. The project includes 4,776 square yards of pavement removal, 4,650 square yards of 8-inch aggregate base, 2,327 feet of curb and gutter, and 3,793 square yard of 9-inch compacted concrete pavement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents