Similar Projects
Upgrade Track and Field - 2022 Bond - Abbott Independent School District
Infrastructure
Conception
$3,500,000 CJ est. value
Abbott, TX 76621

New Practice Gym - 2022 Bond - Abbott Independent School District
New Construction, Infrastructure
Conception
$1,300,000 CJ est. value
Abbott, TX 76621

Enclose the Outdoor Space Between Two Existing Building
Renovation, Infrastructure
Design
$500,000 CJ est. value
Aquilla, TX 76622

Foxfury Lighting
New Construction, Infrastructure - 11,908 SF
Design
$1,200,000 CJ est. value
Hillsboro, TX 76645

Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$417,988 CJ est. value
Hillsboro, TX 76645

Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$417,988 CJ est. value
Hillsboro, TX 76645

Mount Calm ISD - High School Competition Gym - RE-BID CSP's 27-C, 28-B, 32-B
New Construction, Infrastructure - 16,041 SF
Sub-Bidding
$175,000 CJ est. value
Mount Calm, TX 76673

Mill and Overlay
Infrastructure
Post-Bid
$2,727,202 est. value
Itasca, TX 76055

Hillsboro Community Development Block Grant Sidewalk and Curb Ramp Improvements
Infrastructure
Post-Bid
$1,700,000 est. value
Hillsboro, TX

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

SH0081 - Hot Mix
Infrastructure
Results
$289,500 est. value
TX

Buc-ee's #59 / Hillsboro
New Construction, Infrastructure - 74,000 SF
Construction
$60,000,000 CJ est. value
Hillsboro, TX 76645

Buc-ee's #59 / Hillsboro
New Construction, Infrastructure - 74,000 SF
Construction
$60,000,000 CJ est. value
Hillsboro, TX 76645

IH 35 from FM 3002 to US 82 - 601CT0000002746 - Wichita Falls Department of Transportation
Infrastructure
Pending Verification
$19,792,734 CJ est. value
Hillsboro, TX 76645

IH 35 from FM 3002 to US 82 - 601CT0000002746 - Wichita Falls Department of Transportation
Infrastructure
Pending Verification
$19,792,734 CJ est. value
Hillsboro, TX 76645

Last Updated 03/17/2023 02:34 PM
Project Title

Hillsboro Middle School SRTS Phase 2

Physical Address View project details and contacts
City, State (County) Hillsboro, TX 76645   (Hill County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction Nearing Completion, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $344,246 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 17, 2023, construction is underway and nearing completion. An exact timeline for construction has not been confirmed. CSJ 0909-37-071 This project consists of the installation of approximately 1125 SY of concrete sidewalk and curb ramps, combined; 2 small road sign assemblies; approximately 1160 SY of topsoil and sod including vegetative watering; and approximately 110 LF of 24" pavement markings for pedestrian crosswalks. Each bid must be accompanied by cash or a certified cashier's check, drawn on a bank or trust company authorized to do business in the State of Texas, payable to City of Hillsboro in an amount at least equal to five percent (5%) of the total amount of the bid, as a guarantee that a contract will be entered into. In lieu of cash or a certified check, the Bidder may submit a bid bond in the form prescribed in paragraphs 5.01 and 5.02 of the General Conditions. The right is reserved to reject any or all bids, to waive informalities, and to award contract or contracts which, in the opinion of the City of Hillsboro, appear to be in its best interest. The City of Hillsboro reserves the right to hold any or all proposals for the period of time from the opening of bids as specified in Section 00300, Bid Form. All contractors/subcontractors that are debarred, suspended, or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity in part or in full under this project. Minority Business Enterprises, Small Business Enterprises, and Women Business Enterprises, and Historically Underutilized Business firms are encouraged to submit bids Cut-off date Tuesday, August 9 at 5:00 PM. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents