Similar Projects
Last Updated | 08/15/2022 02:33 PM |
Project Title | Retaining Walls Replacement Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Bucksport, ME 04416 (Hancock County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work under this project consists of replacement of small landscape block walls at five properties along US Route 1 and Central Street in Bucksport. The scope of work includes removals of the existing segmental block walls and installation of replacement walls including excavation, new small landscape block wall and associated underdrain system, repaving and restoration of lawns in impacted areas, including erosion control, traffic control, and providing all materials, equipment, and labor to provide a complete project. The project must be substantially completed within 75 consecutive calendar days and complete within 90 calendar days after the execution of Notice to Proceed. The successful Contractor shall be required to provide Performance and Payment Bonds, each equal to 100% of the Contractor's bid price at the time of contract execution. The Owner reserves the right to reject any or all bids, to accept any bid that it deems to be in its best interests and to waive any irregularities in bidding. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |