Similar Projects
2022 Street Construction Project C
Infrastructure
Bidding
$950,000 est. value
Wausau, WI

Business Campus Trail - 72nd Avenue
Infrastructure
Bidding
$480,000 est. value
Wausau, WI 54403

Caroline Street Reconstruction LRIP
Post-Bid
Athens, WI 54411

Resurfacing of Nolan Road
Post-Bid
WI 54408

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Street and Utility Improvements
Results
$95,000 est. value
Edgar, WI

Chip Seal
Infrastructure
Bidding
$60,000 est. value
Birnamwood, WI 54414

Blacktop
Infrastructure
Post-Bid
Athens, WI

Airport Surfacing
Results
Brookfield, Janesville, Lancaster, Tomah, Waukesha, Wausau, Woodruff, WI 53072

County Road X Mill and Overlay
Infrastructure
Post-Bid
Wausau, Weston, WI 54403

2021 Street Improvements
Results
Less than $124,000 est. value
Edgar, WI

Sealcoat
Infrastructure
Post-Bid
Wausau, WI

2021 Street Construction Project A
Results
Wausau, WI

Crack Sealing
Infrastructure
Post-Bid
WI

2021 Street Construction Project B
Results
Wausau, WI

Last Updated 07/07/2022 08:18 AM
Project Title

Thomas Hill Road - Pavement Replacement

Physical Address View project details and contacts
City, State (County) Edgar, WI 54426   (Marathon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Cassel, Marathon County, Wisconsin, is accepting sealed bids for Thomas Hill Road, pavement replacement, from Edgar Village limits to 200 feet east of bridge 1370' x 21' wide. This is an LRIP project. Scope of Work: Provide traffic control, signing and flagging as needed. Pulverize the existing asphalt pavement for base course. Fine grade, water and compact the base course material. Pave with Wis DOT Spec. type 58-28S asphalt mix, compact to an average thickness of 3 inches in two lifts. Finish place and compact 2 foot shoulder gravel.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents