Similar Projects
Aurora Central Catholic High School STEM Building
New Construction, Infrastructure
Design
$4,500,000 CJ est. value
Aurora, IL 60506

Aries Gonzalez Child Center Storage Building Project
New Construction, Infrastructure
Bidding
$255,000 CJ est. value
Aurora, IL 60505

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

New Elementary School – Bid Release 3
New Construction - 86,260 SF
Post-Bid
Hampshire, IL

Library and Office Renovations
Results
Elgin, IL 60123

2021 Summer Work at Batavia HS and Rotolo MS
Results
Batavia, IL 60510

Mooseheart Activity Center
Addition
Construction
Mooseheart, IL 60539

Hough Street ES and Sunny Hill ES
Renovation
Post-Bid
Barrington, Carpentersville, IL 60010

2021 Summer Renovations - Bid Release 3
Renovation
Results
Carpentersville, Hampshire, IL 60140

2022 Summer School Improvements
Renovation
Post-Bid
Algonquin, Carpentersville, IL 60110

Servery
Renovation
Results
Aurora, IL 60506

Cafeteria Expansions
Addition
Post-Bid
Elgin, IL 60124

Drinking Fountains Installation
Alteration
Results
Elgin, IL

2022 Window Replacements
Alteration
Post-Bid
Aurora, IL 60505

2022 BHS Stadium Improvements
Renovation
Results
Batavia, IL 60510

Last Updated 08/29/2022 02:35 PM
Project Title

Resilience Education Center - Phase 2

Physical Address View project details and contacts
City, State (County) Aurora, IL 60505   (Kane County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall pay, if applicable, not less than the prevailing rate of wages as established, to all laborers, workmen and mechanics in the performance of Work under this Contract in accordance with "An Act regulating wages of laborers, mechanics and other employed under contracts of Public Works." 820 ILCS 130/1 et seq. The Owner reserves the right to reject any and all bids, to waive any informality in bidding, or accept the bid that, in his opinion, will serve his best interests. Substantial completion date for demolition is July 29, 2022 New 2 story building including 1 story storm shelter to hold after-school programs for the East Aurora School District. The intent of this project is to construct a new 30,000 sf, 2 story after school program building for the East Aurora School District. The structure is slab on grab on the first floor with a storm shelter in the eastern one-story portion of the structure.

Details

2 Stories Above Grade, 31,218 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents