Similar Projects
West Story Street- 4th to 8th Avenue - SCR27 - City of Bozeman
Infrastructure
Conception
$854,400 est. value
Bozeman, MT 59715

Bogert Place - Church to Story Street - SCR26 - City of Bozeman
Infrastructure
Conception
$402,000 est. value
Bozeman, MT 59715

Y--GAOA - EMDD Fog Seal
Term Contract
Design
$100,000 to $250,000 est. value
Billings, MT 59101

Raw Water Intake, Pump Station, and Pipeline
Renovation, Infrastructure
Bidding
$50,000 est. value
Fort Smith, MT

Access Renovations for Parking Lots L and K
Infrastructure
Bidding
$250,000 to $500,000 est. value
Fort Harrison, MT 59636

Mercury Street Improvements Project
Infrastructure
Post-Bid
Butte, MT 59701

Removal and Replacement of Road and Parking AC Pavement in Riverfront Park
Infrastructure
Post-Bid
Billings, MT

24th Street West Central Avenue Signal, Turn Lane, and Pedestrian Improvements
Infrastructure
Results
Billings, MT 59102

Anaconda Stack State Park Parking Lot Improvements
Infrastructure
Results
$125,000 est. value
Anaconda, MT 59711

Old Hardin Road Sidewalk: Phase II
Infrastructure
Bidding
$130,000 est. value
Lockwood, MT 59101

Phase 1 Distribution System Improvements
Alteration
Post-Bid
Big Timber, MT

City ADA Project
Infrastructure
Results
Billings, MT 59102

Riverfront Park Trail
Infrastructure
Bidding
$420,000 est. value
Billings, MT 59101

Replace 2 Structures, Grading, Gravel, Pms Overlay, Sidewalk, Curb/Gutter And Guardrail On The Beaver Creek-Wibaux 1 Mile s Wibaux Project Located In Wibaux County
Infrastructure
Post-Bid
MT

Jaycee Park Sidewalk and Shelter Project
Renovation, Infrastructure
Results
Dillon, MT

Last Updated 07/15/2022 02:01 PM
Project Title

Black Lot Improvements - P024 - City of Bozeman

Physical Address View project details and contacts
City, State (County) Bozeman, MT 59715   (Gallatin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $410,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improve the parking lot layout, set-backs, Landscaping, signage, lighting, required storm Water treatment infrastructure requirements and Parking kiosk. This project is in included in the City of Bozeman FY 2023-2027 Capital Improvement Plan (CIP). As of July 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents