Similar Projects
North-South Tunnel Project
Conception
$12,000,000,000 est. value
Boston, MA

On-Call Tunnel Repairs Systemwide
New Construction
Bidding
Boston, MA

Removing the Existing Concrete Spillway Structure and Constructing New Spillway
Post-Bid
Leicester, MA

Spring Street Tide Gate Replacement
Post-Bid
Everett, MA 02149

Weymouth Great Pond Dam Improvements
Results
Less than $1,398,900 est. value
Weymouth, MA 02188

Construction of Penstock Closures and Infill
Results
Holyoke, MA 01040

Muzzy Dam Flow Control Gate Replacement and Dam Repairs Project
Post-Bid
Spencer, MA

Sugden Reservoir Dam Maintenance Repairs
Results
Less than $100,000 est. value
Spencer, MA

Waite Pond Dam Repairs
Results
Leicester, MA

Lancelot Lake Dam Improvements
Results
Less than $475,000 est. value
Becket, MA

Piper Pond Dam Repairs
Results
$247,690 est. value
West Springfield, MA

Watershops Pond Dam Rehabilitation
Results
$577,810 est. value
Springfield, MA

Cady Brook Diversion Dam
Results
$610,483 est. value
Pittsfield, MA

Lake Holbrook Dam Rehabillitation
Results
$900,000 est. value
Holbrook, MA 02343

Wachusett Reservoir North Dike and South Dike Instrumentation
Results
Less than $240,000 est. value
West Boylston, MA

Last Updated 06/23/2021 08:49 AM
Project Title

Resiliency Improvements at Watershops Pond Dam

Physical Address View project details and contacts
City, State (County) Springfield, MA   (Hampden County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes replacement of the bascule crest gate and two sluice gates at the Watershops Pond Dam and includes sitework maintenance and improvement of the dam. The new gates and new hydraulic power unit are being fabricated by others. The sitework includes but is associated with not limited to site preparation and site demolition; sediment and erosion controls; clearing and grubbing; control of water; earthwork; reinforced concrete; stone masonry repairs; gravity-type retaining wall, paving and surfacing; and misc. site improvements.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents