Reported 10/30/2021 12:00 AM
Project Title

Sidewalk Snow Removal

Physical Address View project details and contacts
City, State (County) Monticello, IL 61856   (Piatt County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Snow Requirements for Piatt County Office Building Removal of snow shall occur when one half (1/2”) of an inch or more of snow accumulates on the ground surfaces will be maintained in a "slip free" condition. Owners reserve the right to request additional snow removal as needed. Salting shall occur when ¼” of snow accumulates on the ground Surfaces. There is a zero tolerance for ice. Owner reserves the right to have the contractor salt at other times, including weekends or evenings. Owner reserves the right to postpone snow removal operations when weather, financial, or other conditions necessitate a reduction of snow removal services. At minimum a path to the front doors and N.E. door will be cleared by 7 A.M. and the remainder of the walks and steps will be cleared by 8 A.M. Snow Requirements for Courthouse Removal of snow shall occur when one half (1/2”) inch or more of snow accumulates on the ground surfaces will be maintained in a "slip free" condition. Owners reserve the right to request additional snow removal as needed. Salting shall occur when ¼” of snow accumulates on the ground Surfaces. There is a zero tolerance for ice. Owner reserves the right to have the contractor salt at other times, including weekends or evenings. Owner reserves the right to postpone snow removal operations when weather, financial, or other conditions necessitate a reduction of snow removal services. At minimum a path to the front doors will be cleared by 7 A.M. and the walks and steps will be cleared by 8 A.M. Snow Requirements for the Public Safety Building Removal of snow shall occur when one half (1/2”) inch or more of snow accumulates on the ground surfaces will be maintained in a "slip free" condition. Owners reserve the right to request additional snow removal as needed. Salting shall occur when ¼” of snow accumulates on the ground Surfaces. There is a zero tolerance for ice. Owner reserves the right to have the contractor salt at other times, including weekends or evenings. Owner reserves the right to postpone snow removal operations when weather, financial, or other conditions necessitate a reduction of snow removal services. A ‘slip free’ condition access to all doors are to be at all hours.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents