Similar Projects
Reported | 10/30/2021 12:00 AM |
Project Title | Sidewalk Snow Removal |
Physical Address | View project details and contacts |
City, State (County) | Monticello, IL 61856 (Piatt County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Snow Requirements for Piatt County Office Building Removal of snow shall occur when one half (1/2”) of an inch or more of snow accumulates on the ground surfaces will be maintained in a "slip free" condition. Owners reserve the right to request additional snow removal as needed. Salting shall occur when ¼” of snow accumulates on the ground Surfaces. There is a zero tolerance for ice. Owner reserves the right to have the contractor salt at other times, including weekends or evenings. Owner reserves the right to postpone snow removal operations when weather, financial, or other conditions necessitate a reduction of snow removal services. At minimum a path to the front doors and N.E. door will be cleared by 7 A.M. and the remainder of the walks and steps will be cleared by 8 A.M. Snow Requirements for Courthouse Removal of snow shall occur when one half (1/2”) inch or more of snow accumulates on the ground surfaces will be maintained in a "slip free" condition. Owners reserve the right to request additional snow removal as needed. Salting shall occur when ¼” of snow accumulates on the ground Surfaces. There is a zero tolerance for ice. Owner reserves the right to have the contractor salt at other times, including weekends or evenings. Owner reserves the right to postpone snow removal operations when weather, financial, or other conditions necessitate a reduction of snow removal services. At minimum a path to the front doors will be cleared by 7 A.M. and the walks and steps will be cleared by 8 A.M. Snow Requirements for the Public Safety Building Removal of snow shall occur when one half (1/2”) inch or more of snow accumulates on the ground surfaces will be maintained in a "slip free" condition. Owners reserve the right to request additional snow removal as needed. Salting shall occur when ¼” of snow accumulates on the ground Surfaces. There is a zero tolerance for ice. Owner reserves the right to have the contractor salt at other times, including weekends or evenings. Owner reserves the right to postpone snow removal operations when weather, financial, or other conditions necessitate a reduction of snow removal services. A ‘slip free’ condition access to all doors are to be at all hours. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |