Similar Projects
Replacement of Ultraviolet Disinfection System
Renovation
Sub-Bidding
$500,000 CJ est. value
Ottawa, KS 66067

LMR Microwave Backhaul Replacement Project
Renovation
Sub-Bidding
$100,000 CJ est. value
Lawrence, KS 66044

Parking Control Equipment
Term Contract
Post-Bid
KS

Portable Dirt Screening Plant
Alteration
Post-Bid
Topeka, KS

Northwestern Division Crane Multiple-Award Task Order Contract (MATOC)
Results
$2,000 to $99,900,000 est. value

Northwestern Division Crane Multiple-Award Task Order Contract (MATOC)
Results
$2,000 to $99,900,000 est. value

Dishwasher Replacement
Renovation
Sub-Bidding
$110,000 CJ est. value
Andover, KS 67002

Trailer Mouted Air Compressor
Alteration
Post-Bid
Wichita, KS

Loader/Backhoe for Water Distribution Division
Alteration
Results
Topeka, KS

Annual Air Compressor Maintenance and Service
Term Contract
Post-Bid
Topeka, KS

Replace Harmonic Filter B56
Term Contract
Results
$25,000 to $100,000 est. value
KS

Full Circle Clamp Couplings (Repair Clamps)
Term Contract
Post-Bid
Topeka, KS

4-Leg Parallelogram Lift System
Alteration
Results
$330,000 est. value
Topeka, KS 66603

One (1) 2021 Model Year or Newer Compact Excavator
Alteration
Post-Bid
Derby, KS

Tow Behind 28 Direct Drive Stump Cutter
Alteration
Post-Bid
Wichita, KS

Last Updated 01/30/2023 01:05 AM
Project Title

Miami RWD #2 Water Treatment Plant Expansion Project - Phase II Equipment Procurement

Physical Address View project details and contacts
City, State (County) Paola, KS 66071   (Miami County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

THIS BID IS ONLY FOR THE EQUIPMENT PROCUREMENT CONTRACT FOR THE MIAMI RWD #2 WTP EXPANSION PROJECT - PHASE II THAT IS ALREADY OUT FOR BID** Downloadable Project Files contain RFI form to be filled out by bidders. Equipment Procurement consists of the following equipment to be provided for the Miami RWD #2 Water Treatment Plant Expansion Project - Phase II: vertical turbine pumps, variable frequency drives, chlorine gas secondary containment vessels system, vertical rapid mixer system, and backup generator system and automatic transfer switch.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents