Similar Projects
Replacement/restructuring of the Portico of the Hampstead Public Library
Renovation
Design
$20,000 CJ est. value
Hampstead, NH 03841

Multiple Roof Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Keene, NH 03431

Remote Site Roof Replacement (Supply and Install)
Term Contract
Sub-Bidding
Concord, NH 03301

Roof Repair
Alteration
Post-Bid
Bethlehem, NH

Asphalt Roof Shingle Replacement
Alteration
Post-Bid
Salem, NH 03079

Metal Roof Remove and Replacement
Results
Henniker, NH

Roof Repairs - Three Pump Stations
Alteration
Results
Laconia, NH

Pre-Qualification of Contractors for 2022
Renovation, Infrastructure
Post-Bid
Manchester, NH

Roof Replacement for the Haverhill Corner Precinct Building
Alteration
Results
Haverhill, NH 03765

Forest Glade Cemetery - Italianate Well House Roof Reconstruction
Alteration
Post-Bid
Somersworth, NH

Metal Roof Replacement
Alteration
Results
Henniker, NH

Roof Replacement on Salt Sheds
Alteration
Post-Bid
$492,520 est. value

Fire Department Roof Project
Alteration
Results
Windham, NH 03087

Opechee Track Building Roof Replacement
Alteration
Post-Bid
Laconia, NH

Spaulding High School Roof Replacements - Rochester School District
Alteration
Results
Rochester, NH 03867

Last Updated 10/26/2022 07:05 PM
Project Title

Asphalt Shingle Roof Replacement and Repairs for the Barn at Lake Tarleton State Park

Physical Address View project details and contacts
City, State (County) Piermont, NH 03779   (Grafton County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish a contract bond in the amount of one hundred percent (100%) of the contract award, if the contract award is Seventy-five thousand dollars ($75,000) or more, as security for the completion of the contract in accordance with the plans and specifications and contract documents. The form of bond shall be that provided for by the Department, and the surety shall be acceptable to the Commissioner. No contract bond shall be required on contract awards of less than Seventy-five thousand dollars ($75,000). To guarantee all of the work performed under this contract to be done in accordance with the plans and specifications and contract documents. The intent ofthe contract is to provide the State with a new asphalt shingle roof on the Barn at Lake Tarleton State Park in Piermont, NH. The roof shall be watertight and completely finished. The following work items give a general summary of the extent ofthe work but are not intended to be a complete itemization ofthe work. a)Strip and dispose of all existing asphalt shingles as indicated on the plans. b) Replace deteriorated sheathing. c) Replace the fascia, trim and rake boards if necessary. d) Install ice and watershield where required. e) Install drip edges. f) Install Asphalt Shingle roofing system. g) Provide the following Warranties at the completion ofthe job 2 Year Installers Warranty. Provide Asphalt shingle manufacturer's warranty (50 year). Provide Asphalt Shingle manufacturer's wind warranty 130 MPH The Barn is located off of 849 Lake Tarleton Road Piermont NH 03779. The mandatory pre-bid meeting will be held outside ofthe Barn.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents