Similar Projects
Replace Fire Alarms - Multiple Buildings - Geneva
Renovation
Conception
Geneva, NY 14456

New Stem Building
New Construction
Design
$6,000,000 est. value
Troy, NY

Hostos Community College Allied Health & Natural Science Complex
New Construction - 170,000 SF
Design
$10,000,000 CJ est. value
Bronx, NY 10451

Upgrade Freight and Passenger Elevators, CAB - Construction
Renovation
Bidding
$500,000 to $1,000,000 est. value
Syracuse, NY 13210

SUNY Albany Rehabilitation Plaza - 5th Floor South
Renovation
Bidding
$5,000,000 to $10,000,000 est. value
Albany, NY 12206

Replace Building Elevator Bush Hall
Post-Bid
Delhi, NY 13753

Sheldon Hall Lower Level Renovation
Renovation
Post-Bid
Oswego, NY

Randall Hall Bathroom Renovations at SUNY Cortland
Renovation - 38,232 SF
Results
$250,000 to $950,000 est. value
Cortland, NY 13045

Jefferson Community College - Green Campus Entryway Phase 2
Results
$33,750 to $1,156,031 est. value
Watertown, NY 13601

Renovate Memorial Hall - Phase 1 at SUNY Plattsburgh
Construction
$10,000,000 to $15,000,000 est. value
Plattsburgh, NY 12901

Replace Roof and Rehabilitation 4th Floor, Student Union at SUNY New Paltz
Construction
$5,000,000 to $10,000,000 est. value
New Paltz, NY 12561

Phillips Hall 339A and 339B Lab Renovation
Renovation
Bidding
$800,000 to $825,000 est. value
Ithaca, NY 14853

Seneca Hall Entrance Renovation at SUNY Morrisville
Renovation
Post-Bid
Morrisville, NY 13408

Biomedical Research Building (BRB) Pharmacy Renovation
Renovation
Results
Buffalo, NY

Bard Hall Code Improvements
Renovation
Construction
$4,500,000 est. value
Ithaca, NY 14853

Last Updated 06/27/2022 09:48 AM
Project Title

FMCC Campus Labs and Classrooms Renovations - Phase 3

Physical Address View project details and contacts
City, State (County) Johnstown, NY 12095   (Montgomery County)
Category(s) Education, Laboratory
Sub-Category(s) College/University, Laboratory
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $27,000 to $478,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the alteration of classrooms and labs in the college's existing Classroom Building originally constructed in 1967. The estimated construction cost of each contract is as follows: Contract 1: $478,000; Contract 2: $57,000; Contract 3: $27,000; Contract 4: $94,000.

Details

College/University, Renovation, Laboratory, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents