Similar Projects
Z--Mechanical, Electrical and Plumbing (MEP) Multiple Award Construction Contract
Design
$150,000 to $10,000,000 est. value

Fox Senior Center Mechanical Upgrades
Bidding
Mount Kisco, NY 10549

Repairs to Leaking Boiler at Cacace Justice Center
Post-Bid
Yonkers, NY

Eastchester UFSD. Waverly School Boiler Replacement
Post-Bid
Eastchester, NY

Boiler Removal and Replacement
Results
North Salem, NY

Water Heater Replacement at Scarsdale Middle School
Results
Scarsdale, NY 10583

Boiler Plant and HVAC Upgrades
Post-Bid
Ossining, NY 10562

Boiler Replacement and Asbestos Abatement - School 9
Results
Yonkers, NY 10703

Window Replacement and Security Upgrades Project and Boiler Heater Plant Upgrades at School 8
Post-Bid
Yonkers, NY 10708

Boiler Feed Replacement at Cross Hill Academy
Results
Yonkers, NY 10703

Domestic Hot Water Microbiological Treatment Systems
Term Contract
Post-Bid
Kingston, Port Jervis, Poughkeepsie, Suffern, Valhalla, Warwick, NY

Boiler Replacement at Scarsdale High School
Results
Scarsdale, NY

Boiler Cleaning and Maintenance
Post-Bid
Port Chester, NY 10573

Mini-Tank Water Heaters
Results
NY

Boiler Water Chemical Treatment
Post-Bid
Port Chester, NY 10573

Last Updated 10/04/2019 04:00 PM
Project Title

Westlake Middle School – Boiler Replacement

Physical Address View project details and contacts
City, State (County) Thornwood, NY 10594   (Westchester County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Contract H – General Construction, Asbestos Abatement, Plumbing, Mechanical and Electrical Construction
Details
Division 02 - Existing Conditions, Demolition, Selective Demolition, Asbestos Remediation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Joint Sealants.
Division 09 - Finishes, Plaster and Gypsum Board Assemblies, Painting, Interior Painting.
Division 22 - Plumbing, Operation and Maintenance of Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Air Duct Accessories, Dampers, Volume-Control Dampers, Breechings, Chimneys, and Stacks, Heating Boilers.
Division 26 - Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Switchboards and Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Interior Lighting, Emergency Lighting, Exterior Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents