Similar Projects
Welding Shop Electrical Upgrade
Bidding
Tarboro, NC 27886

Furnish and Deliver GE LED Flood Light Fixtures
Post-Bid
Rocky Mount, NC

RMFD Electrical and Plumbing Upgrades
Post-Bid
Rocky Mount, NC 27802

Wastewater Treatment Plant Electrical Improvements
Results
Rocky Mount, NC 27804

Highway 97 Lift Station - Motor Control Panel Replacement
Results
Less than $115,488 est. value
Rocky Mount, NC 27801

NCDMV SE Main Street Boring
Post-Bid
Rocky Mount, NC

Furnish, Deliver and Install Tubular Steel Poles
Results
Less than $6,596 est. value
Rocky Mount, NC

Testing and Repair of Hydroelectric Generator Governor Systems at Hydroelectric Facilities for the U.S. Army Corps of Engineers
Post-Bid

Alorica Switch Gear Upgrade
Results
Rocky Mount, NC 27804

Annual Preventative Maintenance on City Owned Generators
Term Contract
Post-Bid
Rocky Mount, NC 27802

Sutton Road H-Frame Transmission and Distribution Installation
Results
Less than $104,176 est. value
Rocky Mount, NC

Substation 230 KV Autotransformer
Post-Bid
Rocky Mount, NC 27804

Electric Transformers 2500kva
Results
Rocky Mount, NC

Electric Transformers 1500KVA
Post-Bid
Rocky Mount, NC 27802

Ceiling, Walls, HVAC and Electrical Repairs - Edgecombe County Courthouse
Results
Tarboro, NC 27886

Last Updated 01/20/2020 08:33 AM
Project Title

Transmission Pole Change

Physical Address View project details and contacts
City, State (County) Rocky Mount, NC   (Edgecombe County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $66,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and installation of approximately (6) new steel transmission poles. This project is located in two areas around the City of Rocky Mount. First location is along Smokey Road between Wesleyan Blvd and Airport Road in Rocky Mount NC. The second location in located at the end of Proctor Street in Rocky Mount NC. 1. Installation of (6) 70 to 80-foot steel transmission poles. 2. Removal of (6) existing 70 to 80-foot wood transmission poles. Poles that have complex communication attachments should be topped no more than 12 inches above the highest communication wire. 3. The Company awarded the contact shall be responsible for transferring all de-energized transmission primary conduct, static wire, guying and installation of new anchoring as needed for this project. 4. The Company awarded the contact shall be responsible for transferring all energized distribution primary, neutral conduct, guying, anchoring, transformers, secondary and lights as needed for this project. 5. The Company awarded the contact shall be responsible for transferring all communication wiring that's not deemed complex by Energy Resources representative without additional cost. Cost should be included in the price per pole change out. 6. The Company awarded the contact shall be responsible for all traffic control along Smokey road. Any and all road/lane closing should be approved by the City of Rocky Mount.

Details

Division 26 - Electrical.
Division 33 - Utilities, Electrical Utility Transmission and Distribution, Electrical Utility Poles.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents