Similar Projects
Timber Dock Gangway & Piles
Infrastructure
Pending Verification
Newport, RI

Dock and Boat Launch Improvement at the Landing
Infrastructure
Post-Bid
Less than $200,000 est. value
Central Falls, RI

URI Reconstruction NBC Pier PHI
Results
Providence, RI

Port of Galilee Dock Repairs
Infrastructure
Post-Bid
Narragansett, RI

Church Street Dock Expansion
Infrastructure
Results
Bristol, RI

Pier 1 South Face Rehabilitation
Infrastructure
Results
$300,000 est. value
North Kingstown, RI 02852

Installation/Removal of Freshwater and Saltwater Docks and Gangways - DEM
Term Contract
Results
Providence, RI

Crew Transfer Vessel (CTV) Harbor
Infrastructure
Post-Bid
$700,000 est. value
North Kingstown, RI 02852

Police Cove Transient Dock
Results
Barrington, RI 02806

State Street Dock Marina Fueling Facility
Post-Bid
Bristol, RI 02809

Phase 2B Design/Build Services o Facilitate Repairs to the North Bulkhead at the Port of Galilee
Infrastructure
Post-Bid
Narragansett, RI 02882

Concrete Floating Breakwater for the Future Church Street Dock Expansion
Infrastructure
Results
Bristol, RI

Pedestrian Bridge
Alteration
Conception
$4,000,000 est. value
Providence, RI

Landing Rehabilitation Contract 1 Marine Improvements
Post-Bid
Pawtucket, RI

Marine Barge and Crane Removal, Providence River
Results
Providence, RI

Last Updated 07/01/2022 01:57 PM
Project Title

Walker Farm Recreation and Resilience Improvements

Physical Address View project details and contacts
City, State (County) Barrington, RI 02806   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall be to provide the Town of Barrington (hereafter “Town”) with completed ready-for-use facilities. Scope includes but is not limited to the following: Installation of Pedestrian and Vehicular Surfacing, Low-Profile Paddlecraft Dock, Stepped Paddlecraft Launch, Accessible Viewing Platform, Slope Restoration, Salt Marsh Redevelopment, and. Incidental to these improvements are the installation of Erosion Control measures, Site Clearing, Site Furnishings, Signage, Fencing, and all work necessary to complete the project.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents