Similar Projects
Construction of the Chip Seal Program Fiscal Year 2020/2021 and 2021/2022 Project
Bidding
Prescott Valley, AZ

SR 69 Frontage Road Pavement Overlay Project
Bidding
$390,000 est. value
Prescott Valley, AZ

Pavement Preservation
Post-Bid
Cottonwood, AZ 86236

AZ FTFS 104(1) Mingus Mountain
Post-Bid
$400,000 to $1,000,000 est. value
AZ 86326

Page Springs Road Seal Coat
Results
Less than $195,000 est. value
Prescott, AZ

Y--Badger Springs Recreation Site Roads
Results
$150,000 to $250,000 est. value
Black Canyon City, AZ 85324

Road 2 North Paving Improvements Project
Bidding
$800,000 est. value
Chino Valley, AZ

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

TOPV IGA Roadway Improvement Projects
Results
Prescott, Prescott Valley, AZ 86314

Chip Seal Summer FY 2020-2021
Post-Bid
$1,012,400 est. value
Prescott, AZ

System Enhancement-Other Enhancements
Results

Supply or Supply and Deliver Hot Asphaltic Concrete
Post-Bid
Prescott, AZ

Viewpoint Drive Connector
Results
Prescott Valley, AZ 86314

Hot Melt Crack Seal Program Fiscal Year 2020/2021 Project
Post-Bid
Prescott Valley, AZ

Verde Valley School Road Overlay
Results
$562,200 est. value
Prescott, AZ 96305

Reported 10/30/2020 12:00 AM
Project Title

Design-Build Services for Verde Connect Road, SR 260 to Cornville Road

Physical Address View project details and contacts
City, State (County) Prescott, AZ 86305   (Yavapai County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Design and build Verde Connect roadway from State Route 260, connecting to the northern leg of the existing Coury Drive roundabout and continuing northeast to Cornville Road at the existing intersection with Beaverhead Flat Road, and a connector road from the Verde Connect road to the existing Middle Verde Road Phase 1 would include construction of approximately 1.85 miles of new 2-lane roadway that will connect State Route 260 to a new bridge that crosses the Verde River about 1.25 miles east of SR 260. Continuing 0.6 miles east of the Verde River, the Verde Connect roadway will terminate and a connector road will branch approximately 1.1 miles to the southeast to connect with existing Middle Verde Road. Phase 2 of the project would continue the Verde Connect road from the intersection with the connector road to Cornville Road. Phase 1 of the project is currently funded for construction. Phase 2 will be included should additional funding be allocated to the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents