Similar Projects
Materials Recovery Facility Single Stream System Design
Infrastructure
Bidding
Chittenden, VT

Farm Road Pipe Arch
Infrastructure
Bidding
West Windsor, VT

Garvin Hill Road and Grout Road Project
Infrastructure
Post-Bid
$25,000 est. value
Hartland, VT

Chester TAP TA17(9)
Infrastructure
Post-Bid
$500,000 to $1,000,000 est. value
Chester, VT

North Troy LPOE Site Civil Repairs
Results
North Troy, VT 05859

Chestnut Hill Road Stormwater Mitigation
Results
Montpelier, VT

Hardwick STP 037-3(7)
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Hardwick, VT

Town Line Road Culvert Replacement
Infrastructure
Post-Bid
Mendon, VT 05701

Burlington STP 2035 (15) C/1
Results
$250,000 to $500,000 est. value
Burlington, VT 05401

Chester STP Culv(60)
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Chester, VT

ANR FWL Front Line Rearing Ponds Improvements
Infrastructure
Post-Bid
Bennington, VT 05201

HVAC Vault and Parking Drainage Upgrade
Results
Waterbury, VT 05676

Construction for Ditching and Culvert Replacements
Infrastructure
Bidding
Strafford, VT

Bovat Road Culvert Replacement
Infrastructure
Post-Bid
Georgia, VT 05478

Elm Street Outfall Stabilization
Results
$15,000 to $30,000 est. value
Winooski, VT

Reported 02/09/2022 12:00 AM
Project Title

Davis Road Box Culvert

Physical Address View project details and contacts
City, State (County) Royalton, VT 05063   (Windsor County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall furnish all supervision, technical personnel, labor, materials, tools, appurtenances, equipment, traffic control, erosion control, staging, disposal sites and services, mobilization/demobilization, bonds, insurance, and services required to perform the work. Fabrication of concrete box culvert, headwalls, footings by precast fabricator; 2. Inside dimensions of the box shall be in conformance with the above-referenced engineered specification 3. Joints between culvert sections shall be watertight; 4. Refer to the construction plans specifications for use of protection board and/or barrier membrane tobe installed over box culvert joint section top surfaces as required; 5. The culvert shall conform with the engineering specifications. The fabricated shop drawings shall be submitted to the River Management Engineer (Scott Jensen) and Horizon Engineering for review and approval prior to fabrication. Excavations/Site Work Required for Installation of Box Culvert in compliance with associated permits.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents