Description |
Plans call for the renovation of the existing building for a medical facility. The scope of work consists of the interior renovation of existing medical office into new dermatology clinic. Work includes but is not limited to site demo, new sidewalks and paving, new architectural casework, countertops, doors and frames, glass, metal stud framing and GWB, acoustical ceilings, flooring, paint, specialties, window coverings, wall protection, signage, plumbing, HVAC and electrical. As of December 27, 2022, all sub-bids have been received by the general contractor. While a firm construction timeline has not yet been determined, construction is expected to begin in February of 2023. |
Details |
6,070 SF. Parking Spaces, 51 Parking Spaces.
Division 03 - | Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete. | Division 04 - | Masonry, Unit Masonry. | Division 05 - | Metals, Structural Metal Framing. | Division 06 - | Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork. | Division 07 - | Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers. | Division 08 - | Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows. | Division 09 - | Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting. | Division 10 - | Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving. | Division 11 - | Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment. | Division 12 - | Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating. | Division 13 - | Special Construction, Radiation Protection. | Division 21 - | Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems. | Division 22 - | Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities. | Division 23 - | Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment. | Division 25 - | Integrated Automation, Integrated Automation Network Equipment. | Division 26 - | Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting. | Division 27 - | Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems. | Division 31 - | Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment. | Division 32 - | Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting. | Division 33 - | Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities. |
|