Similar Projects
Willow Grove Lake Improvements - 560081 - City of Amarillo
Infrastructure
Conception
$200,000 CJ est. value
Amarillo, TX 79107

North Hughes Complete Street - 1720x01 - City of Amarillo
Infrastructure
Conception
$10,080,000 CJ est. value
Amarillo, TX 79107

Hines Memorial Park Playground Equipment Replacement
Renovation, Infrastructure
Design
$4,000 est. value
Amarillo, TX 79107

Microtel Amarillo / Microtel Hotel
New Construction, Infrastructure - 36,178 SF
Design
$3,620,000 CJ est. value
Amarillo, TX 79124

Wastewater Collection Improvements: Amarillo Northeast Interceptor
Infrastructure
Bidding
$52,216,330 CJ est. value
Amarillo, TX 79108

Fueling Center 27th Avenue - Amarillo
New Construction, Infrastructure - 1,366 SF
Bidding
$1,000,000 CJ est. value
Amarillo, TX 79103

Take 5 Oil Change / Amarillo
New Construction, Infrastructure - 1,415 SF
Post-Bid
$400,000 CJ est. value
Amarillo, TX 79109

Take 5 Oil Change / Amarillo
New Construction, Infrastructure - 1,415 SF
Post-Bid
$400,000 CJ est. value
Amarillo, TX 79109

Transit Multimodal Terminal Facility
New Construction, Infrastructure
Results
$7,514,721 CJ est. value
Amarillo, TX 79106

Parking Lot Striping
Infrastructure
Results
$36,380 CJ est. value
Amarillo, TX 79107

Toot 'n Totum
New Construction
Construction
Amarillo, TX 79107

2022 Renovations For Fillmore Lofts
Infrastructure, Renovation - 12,000 SF
Construction
$100,000 CJ est. value
Amarillo, TX 79101

Kohls Sephora Renovation #748 / Amarillo
Demolition, Renovation, Infrastructure - 2,500 SF
Pending Verification
$300,000 CJ est. value
Amarillo, TX 79124

Astoria Park Apartments - Rehabilitation
New Construction, Infrastructure
Pending Verification
$84,060,000 CJ est. value
Amarillo, TX 79102

Fire Station #14 - 411328 - City of Amarillo
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Amarillo, TX 79107

Last Updated 08/14/2023 09:12 AM
Project Title

Fueling Center - Amarillo

Physical Address View project details and contacts
City, State (County) Amarillo, TX 79107   (Potter County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 14, 2023 the project is bidding. A construction timeline has not been confirmed.

Details

1,366 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents