Similar Projects
Clayton Street Knee Wall Project
Bidding
Lawrenceville, GA 30046

Campbell Heights Infrastructure Improvements
Bidding
Lawrenceville, GA

Maple Creek Park Asphalt Drive Parking Lot
Post-Bid
Dacula, GA 30019

Nash Street Extension Project
Post-Bid
Lawrenceville, GA 30046

South Peachtree Sidewalk
Results
Norcross, GA

Buford Multi-Use Trail
Results
Buford, GA 30515

Col/Wynne Russell-West Johns Sidewalk
Post-Bid
Lilburn, GA

Crook Creek Trail
Results
Norcross, GA 30092

Bona Road Sidewalk Improvements
Post-Bid
Buford, GA 30518

Ridge Road (From SR 20/Buford Drive to Highland Oaks Way) Pedestrian Improvement
Results
Lawrenceville, GA 30042

Gunnin Road Sidewalks
Post-Bid
Peachtree Corners, GA 30092

North Peachtree Sidewalk
Results
Norcross, GA 30071

Dacula City Hall Ada Upgrades
Post-Bid
Dacula, GA 30019

Construction of Lloyd North Harris Trail at Harbins Park
Results
Dacula, GA 30019

Corners Connector Town Center
Post-Bid
Peachtree Corners, GA

Last Updated 07/16/2020 04:07 PM
Project Title

Downtown Norcross Compactor Enclosure Construction

Physical Address View project details and contacts
City, State (County) Norcross, GA 30071   (Gwinnett County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves construction of a masonry compactor enclosure in the parking lot owned by the City of Norcross located on parcel number 6254 248, directly behind Paizanos restaurant at 7 Jones Street in downtown Norcross, Georgia. The City of Norcross will demolish approximately 8 asphalt parking spaces, and provide a pad-graded site for construction of the compactor enclosure. After construction of the masonry enclosure, the City of Norcross will install the final asphalt, sidewalks and landscaping. The contractor will be responsible for installation of the concrete approach apron.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents