Similar Projects
Mcgaheysville Wastewater Plant Lagoons Clean Out
Post-Bid
McGaheysville, VA 22840

Stormwater - Wastewater Facility
New Construction - 168,802 SF
Post-Bid
$53,000,000 to $60,000,000 est. value
Burke, VA 22015

Wastewater Clarifier 1 Replacement
Results
$325,000 est. value
Altavista, VA

Installation of Owner Furnished Tertiary Filter Equipment
Results
Mount Crawford, VA 22841

Richlands Wastewater Treatment Plant Upgrade Project
Renovation
Post-Bid
$8,000,000 to $10,000,000 est. value
Richlands, VA 24641

Former Wastewater Treatment Plant Sewer Bypass
Results
$750,000 est. value
Staunton, VA

Phase 3 Wastewater Treatment Plant Improvements
Results
Elkton, VA 22827

Thornburg WWTP Expansion and Upgrade
Results
$16,000,000 est. value
VA

Falling Creek Wastewater Treatment Plant Digesters 1 and 2 Mixing Project
Results
Richmond, VA 23234

Maintenance and Construction Services - Filter Basin 5
Results
Richmond, VA 23231

O and M Building Renovations
Renovation - 37,000 SF
Results
VA 20146

Waste Water Treatment Plant Operations and Maintenance - Point of View (POV) Facility
Term Contract
Results
Lorton, VA 22079

Screenings Removal and Disposal from Chesterfield Wastewater Treatment Plants
Results
Chester, Chesterfield, VA 23836

Occoquan Forest WWTP Closure and Site Restoration
Results
Manassas, VA 20112

Coliseum Dr. PRS Platform Construction - NSOps
Results
Hampton, VA 23666

Reported 01/28/2020 12:00 AM
Project Title

Fuma Sewage Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Fork Union, VA   (Fluvanna County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

The project comprises the construction of a tertiary chemical addition treatment system, a building to house chemicals, the replacement of the existing Fluidyne Sequential batch reactor programmable logic controller improvements to the headworks screening, and other repairs. Site work includes erosion and sedimentation control, excavation and excavation support system, new gravel parking area, replacement of a portion of the perimeter fencing system and site restoration and seeding of grassed areas. The project also includes testing and commissioning of the new piping, instrumentation, equipment and facilities and acceptance of the new facility.

Details

1 Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents