Similar Projects
Combined Maintenance Facility - C114 - City of Aurora
New Construction, Infrastructure
Conception
$31,506,000 CJ est. value
Aurora, IL 60506

Pacifica Riverview
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Aurora, IL 60506

100 N. Broadway
New Construction, Infrastructure - 331,863 SF
Design
$70,000,000 CJ est. value
Aurora, IL 60505

Aurora Central Catholic High School STEM Building
New Construction, Infrastructure
Design
$4,500,000 CJ est. value
Aurora, IL 60506

Hemmens Cultural Center Addition
Addition, Demolition, Renovation, Infrastructure - 70,206 SF
Bidding
$5,800,000 CJ est. value
Elgin, IL 60120

Storage of America / Aurora
New Construction, Infrastructure - 188,000 SF
Bidding
$29,000,000 CJ est. value
Aurora, IL 60506

Cemetery Services
Term Contract, Alteration
Post-Bid
Geneva, IL 60134

EASD Site Improvements 2022
Infrastructure
Post-Bid
Aurora, IL 60505

Windmill Cove Directional Boring and Cable Replacement
Infrastructure
Results
Batavia, IL

FY2022 Pavement and Site Improvements
Infrastructure
Results
Sugar Grove, IL

Elgin Distribution Center
New Construction, Infrastructure - 477,115 SF
Construction
$50,000,000 CJ est. value
Elgin, IL 60120

Wastewater Plant Anaerobic and Aerobic Digesters - City of Geneva
Renovation
Pending Verification
$400,000 CJ est. value
Geneva, IL 60134

Public Works Combined Maintenance Facility Mass Grading, Site Development and Salt Storage Dome
New Construction, Infrastructure - 200,000 SF
Pending Verification
$9,201,734 CJ est. value
Aurora, IL 60506

2023 Bond - Elgin School District U46
Demolition, New Construction, Renovation, Infrastructure
Conception
$179,000,000 CJ est. value
Elgin, IL 60120

Raymond Street Culvert Rehabilitation
Infrastructure
Design
$244,000 CJ est. value
South Elgin, IL 60177

Last Updated 04/20/2023 08:07 AM
Project Title

Wastewater Treatment Facility - Phase IIA Rehabilitation

Physical Address View project details and contacts
City, State (County) Batavia, IL 60510   (Kane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $43,670,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

*The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The engineer's estimate for this project is between $25-$30 million

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents