Similar Projects
Harshmanville Road Water Main Replacement
Post-Bid
Huber Heights, OH 45424

Water Main Pipes, Fittings, Valves and Related Supplies
Post-Bid
Dayton, OH

Beatrice Drive Lift Station (N-30) and Force Main Replacement
Results
Less than $785,000 est. value
OH

Woodland Hills Water Main Replacement, Phase III
Results
Less than $1,202,000 est. value
Kettering, OH

West Franklin Water Main Replacement
Post-Bid
$1,325,000 est. value
Kettering, OH 45432

Liner Pipe
Term Contract
Results

Ductile Iron and Pipe Fittings Price Agreement
Term Contract
Post-Bid
Kettering, OH

Wenzler Park - Phase 2 - Water Main Replacement
Results
Less than $1,627,622 est. value
Dayton, OH

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Post-Bid

Hilton, Glenbeck, Gaylord and West Water Main Replacement
Results
Less than $745,796 est. value
Dayton, OH 45390

Watertight Hatch Replacement
Post-Bid
Dayton, OH 45414

Waving Willow Water Main Replacement
Results
Less than $385,750 est. value
Dayton, OH

Fourth and Fifth Street Water Main Improvements
Results
Less than $1,450,000 est. value
Dayton, OH

Salem Avenue Water Main Improvements
Results
Less than $2,130,000 est. value
Dayton, OH

Division and Homesite Water Main Replacement, for the Montgomery County Environmental Services Department
Results
Less than $765,570 est. value
Dayton, OH

Last Updated 08/26/2019 10:20 AM
Project Title

Huber Heights Water Softening Addition Project

Physical Address View project details and contacts
City, State (County) Huber Heights, OH 45424   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project consists of: Construction of a new membrane nanofiltration building for water softening. Improvements include a new building of approximately 5,800-square foot in area with cartridge filters, nanofiltration equipment, chemical feed facilities, HVAC and plumbing systems, and related pumps, piping, valves, instrumentation and controls, and all associated architectural, structural, mechanical, and electrical work. Construction of a new water supply well and the abandonment of existing well 5. Construction of ah approximately 450-foot long discharge line with headwall to the river. New electric generator.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents