Similar Projects
Smith Creek Park Phase 2A - New Hanover County
New Construction, Infrastructure
Conception
$1,700,000 CJ est. value
Wilmington, NC 28411

Smith Creek Park Phase 2A - New Hanover County
New Construction, Infrastructure
Conception
$1,700,000 CJ est. value
Wilmington, NC 28411

Cottages at College Acres Phase 4
New Construction, Infrastructure - 12,800 SF
Design
$1,000,000 CJ est. value
Wilmington, NC 28403

River Lights Fire Station
New Construction, Infrastructure - 13,873 SF
Design
$5,700,000 CJ est. value
Wilmington, NC 28412

Northern Regional Pump Station & Force Main - Phase A
Infrastructure
Bidding
$20,500,000 CJ est. value
Wilmington, NC 28406

Northern Regional Pump Station & Force Main - Phase A
Infrastructure
Bidding
$20,500,000 CJ est. value
Wilmington, NC 28406

Randall Library Expansion and Renovation Package C - Security
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$180,000 CJ est. value
Wilmington, NC 28403

Visitor Center and Underwater Archaeology Building at the Fort Fisher State Historic Site
New Construction, Infrastructure - 27,000 SF
Post-Bid
$16,500,000 CJ est. value
Kure Beach, NC 28449

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Hanover Pines Nature Park
Infrastructure
Results
$2,865,760 CJ est. value
Wilmington, NC 28412

Eden Village Infrastructure
Infrastructure
Results
Wilmington, NC

Barclay Place Phase 2
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Wilmington, NC 28412

The Range on Oleander
New Construction, Infrastructure - 13,760 SF
Construction
$128,900,000 CJ est. value
Wilmington, NC 28403

The Residence at Canopy Point
New Construction, Infrastructure
Pending Verification
$26,400,000 CJ est. value
Wilmington, NC 28411

Raleigh Street Self Storage Facility
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Wilmington, NC 28412

Last Updated 08/17/2023 02:16 PM
Project Title

Northern Regional Pump Station and Force Main Upgrades, Phase B

Physical Address View project details and contacts
City, State (County) Wilmington, NC 28403   (New Hanover County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $29,475,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

*The closed solicitation has been included below for reference: The Cape Fear Public Utility Authority (CFPUA) is seeking an engineering firm experienced with survey, design, permitting and construction services for sewer pump stations and force mains. The project is to serve northern New Hanover County by significantly increasing sewer conveyance capacity. The project consists of constructing a new major regional pump station in the general vicinity on North Kerr Avenue between Bavarian and Truesdale and constructing a large diameter sewer force main from the new pump station to the Northside Wastewater Treatment Plant. The approximate location of this infrastructure is identified on the attached map, Exhibit A. PHASE A Request for Qualifications is being advertised separately. The $32.8 million dollar project (PHASES A and B combined) is primarily funded by an ARPA grant through NC Wastewater Reserve funds which require strict adherence to project milestone dates. Therefore, the successful firm will be required to demonstrate their ability to meet these milestones without fail. A Preliminary Engineering Report is already in process. The funding agency requires that the Bid and Design Package be submitted no later than January 1, 2023. All ARPA project funds must encumbered for construction by December 31, 2024 to be paid out to contractors and reimbursed from the funding agency to CFPUA by December 31, 2026. The successful firm will have demonstrated success with projects and project accounting funded through North Carolina Division of Water Infrastructure. CFPUA will address questions regarding the RFQ until 2:00 PM on March 9, 2022. Questions concerning this advertisement should be directed to Julia Faircloth, Procurement Manager, Cape Fear Public Utility Authority, at bids@cfpua.org. The selected firm will be informed by the Preliminary Engineering Report and expected to begin route survey within 7 days of project award. If in the best interest of CFPUA, PHASES A and B of the project may be designed by different firms, but the work will occur simultaneously. All submitting firms are required to demonstrate how they can complete PHASE B of the project in its entirety on time, within budget and in accordance with Authority technical requirements The successful firm will demonstrate in their written qualifications the ability to succeed with such capacity of professional engineering services a project that includes: 1. Construction of a new approximately 4 million gallon per day sewer pump station on land adjacent to North Kerr Avenue; and 2. Construction of a sewer force main from the new pump station on North Kerr Avenue to Northside WWTP. Firms submitting Qualifications are encouraged to carefully check them for conformance to the requirements stated herein. Qualifications that do not meet ALL of the below listed requirements, or are sent to any address other than shown above, will be disqualified. No exception will be granted. Project Survey Award March 21, 2022 Project Design Award April 18, 2022 Project Bid and Design Package Submittal Complete December 16, 2022 Construction Final Completion August 1, 2026 All Project Payments Complete October 1, 2026 CFPUA Reimbursed for All Project Payments December 16, 2026 The method of contractor selection has not been determined at this time *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. NCDEQ DWI PROJECT No.: SRP-W-ARP-0062

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents