Similar Projects
Two Rivers - Kewaunee Const Ops / Cold10 / HSIP
Infrastructure
Conception
$8,000,000 CJ est. value
Manitowoc, WI 54220

Two Rivers - Kewaunee Const Ops / Cold10 / HSIP
Infrastructure
Conception
$8,000,000 CJ est. value
Manitowoc, WI 54220

River Point Riverbank Project
Infrastructure
Design
$240,000 CJ est. value
Manitowoc, WI 54220

2022 Nuclear Road Improvements
Infrastructure
Bidding
$690,000 CJ est. value
Mishicot, WI 54228

2022 Nuclear Road Improvements
Infrastructure
Bidding
$690,000 CJ est. value
Mishicot, WI 54228

Hot Mix Paving
Post-Bid
Reedsville, WI 54230

Pavement Repair
Post-Bid
Cleveland, WI 53015

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphaltic Concrete Paving
Results
Manitowoc, WI 54220

NOI RFP Engineering - Green Bay - Manitowoc
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Reedsville, WI 54230

NOI RFP Engineering - Green Bay - Manitowoc
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Reedsville, WI 54230

Pulverizing Chip Sealing
Post-Bid
WI

Manitowoc FFR ARMY Reserve Center Design Build Renovations Solicitation
Renovation - 12,578 SF
Results
$5,000,000 to $10,000,000 est. value
Manitowoc, WI

Hot Mix Resurfacing (Overlay) on Asphalt Pavement of Wagon Wheel Road
Post-Bid
Manitowoc, WI 54220

2021 Sidewalk Replacement and Repair
Results
Kiel, WI

Last Updated 08/16/2022 03:22 PM
Project Title

Repair SSG Andrew Miller ARC Manitowoc, WI

Physical Address View project details and contacts
City, State (County) Manitowoc, WI 54220   (Manitowoc County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Maintenance, Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $9,379,249 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 31, 2022, a design/builder has been awarded. Information regarding future subcontractor bidding opportunities has not been released. A timeline for the start of construction has not been disclosed, however, the project is not believed to have started. Construction is expected to be complete by August of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *The information below is kept for reference.* ______________________________________________________________________________________________________________________________________________________________ Contract Award Date: Sep 28, 2021 Contract Award Number: w912qr21c0044 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 085114387 Contractor Awarded Unique Entity ID (SAM): Contractor Awarded Name: L. S. Black Constructors, LLC Contractor Awarded Address: Saint Paul, MN 55117-2072 USA Base and All Options Value (Total Contract Value): $9379249.00 There is a limit of eight (8) single sided, 8.5" x 11" pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides, for the Design Narrative factor Repair Existing Training Center Building Construct Roof Storm Water System Repair Existing Site Repair Design Fee a) CLIN 0001 Repair Existing Training Center includes all Base Proposal demolition and construction work required within a line five feet outside of the existing building foundation. (b) CLIN 0002 Repair Existing Site includes all Base Proposal demolition and construction work required outside of a line five feet from the existing building foundation. (c) CLIN 0003 Repair Design Fees includes the fees for the Offeror's design professionals to complete the Base Proposal design and construction documents for the project along with Optional Bid Item 0011. The required response date/time has changed from 06-Jul-2021 03:00 PM to 08-Jul-2021 03:00 PM.

Details

,, 17,578 SF - 5,000 SF. 12,578 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents