Similar Projects
Simplified Acquisition of Base Engineer Requirements (SABER)
New Construction, Renovation, Addition
Post-Bid
$2,000 to $500,000 est. value
Dover, DE 19902

EST Building Addition and Renovation at River Road Training Site
Renovation, Addition - 5,244 SF
Results
New Castle, DE

B600 Renovate USACE Conference Room
Renovation
Post-Bid
Less than $25,000 est. value
Dover, DE 19902

Office Building Renovation
Renovation - 27,000 SF
Conception
New Castle, DE 19720

Design/Build Contract Services for Transient Training Officer Barracks Building
New Construction - 12,000 SF
Results
$2,500,000 to $5,000,000 est. value
Bethany Beach, DE

East Field Office Large Term Multiple Award IDIQ for Construction Services with Design Build Capabilities
Results
$30,000 to $3,000,000 est. value

East Field Office Large Term Multiple Award IDIQ for Construction Services with Design Build Capabilities
Results
$30,000 to $3,000,000 est. value

East Field Office Large Term Multiple Award IDIQ for Construction Services with Design Build Capabilities
Results
$30,000 to $3,000,000 est. value

Scannell Readiness Center-Second Floor Restroom Improvements
Renovation
Results
Delaware City, DE 19706

Last Updated 02/28/2022 11:17 PM
Project Title

Building 153 Renovation

Physical Address View project details and contacts
City, State (County) Bethany Beach, DE 19930   (Sussex County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project involves complete renovation of Building 153 at Bethany Beach Training Site, Bethany Beach, DE. The project involves the following at Bethany Beach Training Site – Physical Fitness Center located in Bethany Beach, DE: new construction of a 6,808 SF building to support the Delaware Army National Guard fitness test requirements. There will be demolition of the existing fitness center, with regrading and excavation to prepare the site for the new building. This building will be a steel framed building on concrete foundations, with masonry infill walls. There is a single-slope standing seam metal roof, south facing, with a separate flat roof that houses the rooftop unit. There will be site improvements including sidewalks, storm water management features, bollards and chains, and parking. There will also be HVAC, electrical, and plumbing, telecommunications trades involved.

Details

Military Facility, Renovation, Military Facility, 6,808 SF New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents