Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Seabirds Kitchen
Renovation
Design
San Bernardino, CA 92405

Starbucks #70593 / San Bernardino - Revised
New Construction, Infrastructure - 1,005 SF
Bidding
$750,000 CJ est. value
Highland, CA 92346

Starbucks #70593 / San Bernardino - Revised
New Construction, Infrastructure - 1,005 SF
Bidding
$750,000 CJ est. value
Highland, CA 92346

O'Reilly Auto Parts #2 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

O'Reilly Auto Parts #2 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Replace Pcc and Ac Pavement With Jpcp and Hma Pavement
Infrastructure
Results
CA

Saw Cutting, Asphalt Repair/Replacement, Slurry, and Paving
Infrastructure
Results
Yucaipa, CA 92399

Chuck E Cheese #356
Renovation
Construction
Victorville, CA 92392

Chick-fil-A #0440
New Construction, Renovation - 5,000 SF
Construction
Upland, CA 91786

Mr. Fries
Renovation
Pending Verification
Needles, Riverside, CA 92501

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Pending Verification
$275,000,000 CJ est. value
Redlands, CA 92373

Bartlett Public Parking Lot Lighting Upgrades - B.6 - City of Big Bear Lake
Infrastructure
Conception
Big Bear Lake, CA 92315

Last Updated 12/13/2022 11:07 AM
Project Title

Starbucks and Burger King #4974 / Barstow

Physical Address View project details and contacts
City, State (County) Barstow, CA 92311   (San Bernardino County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected February 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the demolition of an existing structure and the construction of a drive through restaurant and a drive through coffee shop. As of December 13, 2022, a building permit application was filed on March 22, 2022 and is under review with the Barstow Building Department. Information regarding a general contractor or selection has not been provided. A firm construction timeline has not been established.

Details

5,550 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents