Similar Projects
Star Valley Destinations Project 1 - Town of Borden
Infrastructure
Conception
$500,000 CJ est. value
Borden, IN 47106

Charleston Flats
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Charlestown, IN 47111

Bridge Thin Deck Overlay - I 65
Infrastructure
Design
$1,982,956 CJ est. value
Speed, IN 47172

Pike Elementary School (New Elementary School)
New Construction, Infrastructure
Bidding
$18,000,000 CJ est. value
Jeffersonville, IN 47130

West Slurry Wall at Clark-Floyd Landfill
Infrastructure
Post-Bid
$343,000 est. value
Borden, IN 47106

Silver Creek High School Athletic Fields, Early Steel and Roofing Package
Renovation, Infrastructure
Post-Bid
$600,000 CJ est. value
Sellersburg, IN 47172

Clark-Floyd Landfill Drainage And Work Platform Earthwork
Infrastructure
Results
$750,000 to $1,250,000 est. value
Borden, IN 47106

Silver Creek High School Additions and Renovations
Addition, Renovation, Infrastructure
Results
$62,435,465 CJ est. value
Sellersburg, IN 47172

Main Street (FKA Woerner Avenue) Floodwall Gate Replacement
Demolition, New Construction, Infrastructure
Construction
$4,497,000 CJ est. value
Clarksville, IN 47129

North Wastewater Treatment Plant - River Ridge Development Authority
New Construction, Infrastructure
Pending Verification
$42,000,000 CJ est. value
Charlestown, IN 47111

River Ridge Development Authority Development
New Construction, Infrastructure
Pending Verification
$162,000,000 CJ est. value
Jeffersonville, IN 47130

HMA Overlay, Preventive Maintenance - SR 62
Infrastructure
Design
$7,733,165 CJ est. value
Charlestown, IN 47111

Bill Mosley Park
Infrastructure
Post-Bid
$200,000 CJ est. value
Sellersburg, IN 47172

River Ridge Lentz Avenue Storage Facility Pad
Infrastructure
Results
$150,150 CJ est. value
Jeffersonville, IN 47111

Star Valley Destinations - Town of Borden
Infrastructure
Pending Verification
$1,500,000 CJ est. value
Borden, IN 47106

Last Updated 07/20/2023 06:02 PM
Project Title

Sazerac Company Charlestown Distillery

Physical Address View project details and contacts
City, State (County) Charlestown, IN 47111   (Clark County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $408,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a distillery. As of July 20th, 2023, no building plans have been submitted to Clark County. Information regarding the selection of an architect and general contractor has not been released. A timeline has not been made publicly available. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents