Similar Projects
East Avenue Northwest, Shetland to Edgewood
Conception
$3,000,000 est. value
Cedar Rapids, IA

Seminole Avenue North West and Cheyenne Road North West from Seminole to Sioux
Conception
$2,400,000 est. value
Cedar Rapids, IA 52405

8th Avenue South West from 15th Street South West to Rockford Road
Bidding
$3,220,000 est. value
Cedar Rapids, IA 52407

1st Ave West from 6Th Street to Cedar River Bridge Pavement Rehabilitation and Traffic Signals
Bidding
$2,470,000 est. value
Cedar Rapids, IA 52407

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

FY2022 Mill and Overlay Project
Infrastructure
Post-Bid
Creston, IA

West Elm and North Vine Street Improvements
Results
$553,988 est. value
West Union, IA

Clover Lane Overlay
Results
Asbury, IA

32nd Street North East from Carlisle Street through Oakland Road Pavement Reconstruction
Conception
$2,000,000 est. value
Cedar Rapids, IA 52402

CDBG Group 2 - Reconstruction East 7th Street (Iowa to LeClaire) and LeClaire Street (6th-8th)
Infrastructure
Bidding
Davenport, IA 52803

HMA Resurfacing - I-80
Infrastructure
Post-Bid
IA

FY 2022 Pavement Patching
Results
$1,400,000 est. value
Cedar Rapids, IA

Center Point Road North East Lincoln to J Avenue
Conception
$2,350,000 est. value
Cedar Rapids, IA 52402

Hma Resurfacing/Cold in-Place Recycling
Infrastructure
Bidding
IA

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

Last Updated 01/20/2022 06:24 AM
Project Title

HMA Resurfacing with Milling

Physical Address View project details and contacts
City, State (County) IA   (Boone County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

0.5 Mi e Of Ia 17 To 230th St 721.30 Ton Asphalt Binder 297.60 Gallon Asphalt Emulsion, Fog Seal 1.00 Each Field Laboratory/Office 349.12 Ton Granular Shoulders, Type b 12,022.20 Ton Hot Mix Asphalt 24.00 Each Patches By Count 321.30 Square Yard Patches, Full-Depth 955.22 Station Pavement Markings 62,311.30 Square Yard Pavement Scarification Stp-017-2(32)--2c-08 Route: Iowa 17 Approx 0.3 Mi s Of Us 30 To 0.5 Mi n Of Us 30 74.69 Ton Asphalt Binder 17.40 Gallon Asphalt Emulsion, Fog Seal 61.02 Ton Granular Shoulders, Type b 50.00 Linear Foot Guardrail, Formed Steel Beam 1,245.06 Ton Hot Mix Asphalt 72.00 Square Yard Patches, Full-Depth 561.30 Square Yard Paved Shoulders 322.82 Station Pavement Markings 6,478.40 Square Yard Pavement Scarification 187.20 Square Yard Removal Of Pvmnt/Drives/Sdwk 4.00 Each Steel Beam g'Rail Barrier Trans Section

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents