Similar Projects
Us 22/322 Pm
Infrastructure
Conception
$2,850,000 est. value

I-78 - Easton Rd to SR 33
Infrastructure, Renovation
Conception
$21,935,774 CJ est. value
Bethlehem, PA 18015

Nor-Bath Trail Improvements - Phase 3
Infrastructure
Design
$200,000 CJ est. value
Bethlehem, PA 18017

Nor-Bath Trail Improvements - Phase 3
Infrastructure
Design
$200,000 CJ est. value
Bethlehem, PA 18017

Bid Phase 2 Gymnasium / Performing Arts Center
New Construction, Infrastructure
Bidding
Bethlehem, PA 18017

2022 10 Mud Lane Water Main Extension and Well Abandonment
Infrastructure
Bidding
$200,000 CJ est. value
Northampton, PA 18067

AutoZone #1400 / Bethlehem
New Construction, Infrastructure - 5,654 SF
Post-Bid
$1,500,000 CJ est. value
Bethlehem, PA 18015

AutoZone #1400 / Bethlehem
New Construction, Infrastructure - 5,654 SF
Post-Bid
$1,500,000 CJ est. value
Bethlehem, PA 18015

Gracedale Nursing Home - Pedestrian Ramp
Results
Nazareth, PA 18064

Township Line Road Full Depth Reclamation and Paving Project
Results
Bethlehem, PA 18015

D&L Trail Development (North Catasaqua Borough)
New Construction
Construction
$1,449,105 est. value
North Catasauqua, PA

2022 36 Minsi Trail Siphon South Access Improvements
Infrastructure
Construction
$77,400 CJ est. value
Bethlehem, PA 18018

Banana Factory Arts & Education Center / Bethlehem
Demolition, New Construction, Infrastructure - 73,485 SF
Pending Verification
$22,000,000 CJ est. value
Bethlehem, PA 18015

Broad Street Mixed Use Building
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Bethlehem, PA 18018

Dual Bridges over Easton
Infrastructure, Renovation
Conception
$61,439,000 CJ est. value
Bethlehem, PA 18015

Last Updated 08/22/2022 04:33 PM
Project Title

Community Park Parking Lot Expansion

Physical Address View project details and contacts
City, State (County) Freemansburg, PA 18017   (Northampton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $138,200 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 22, 2022. Project is canceled and will be rebid. No specific time for rebid. The project consists of general excavation, subgrade compaction/proof-rolling, installation, and subbase paving operations; and all other associated work listed herein, and as indicated on the plans. CLARIFICATION DEADLINE 6/8/2022 12:00 PM Each bid must be accompanied by a certified check drawn to the order of Freemansburg Borough; or a Bid Bond in favor of Freemansburg Borough, in the amount of 5% of the total bid price. Said check or bond shall be subject to the conditions provided in the Instructions to Bidders. No bid may be withdrawn within sixty (60) days of the date of the bid opening. Freemansburg Borough reserves the right to reject any and all bids and to waive any bidding informalities.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents