Similar Projects
Babbitt Ranch Solar and Storage
New Construction, Infrastructure
Conception
$98,000,000 CJ est. value
Williams, AZ 86046

Babbitt Ranch Wind
New Construction, Infrastructure
Conception
$39,500,000 CJ est. value
Williams, AZ 86046

Northern Arizona Healthcare Flagstaff Medical Center Expansion
Addition, Demolition, Infrastructure
Design
$800,000,000 CJ est. value
Flagstaff, AZ 86001

AutoZone #2782 / Flagstaff
New Construction, Infrastructure - 8,000 SF
Design
$1,500,000 CJ est. value
Flagstaff, AZ 86004

Bridge Rehabilitation
Infrastructure
Bidding
$2,638,000 CJ est. value
Tuba City, AZ 86045

Bridge Rehabilitation
Infrastructure
Bidding
$2,638,000 CJ est. value
Tuba City, AZ 86045

Bodaway Gap Health Center
New Construction, Infrastructure - 123,565 SF
Sub-Bidding
$40,000,000 CJ est. value
Tuba City, AZ 86045

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Segmented Circle Relocation Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Page, AZ 86040

Water Meter Replacement
Infrastructure
Results
Fredonia, AZ

Z--Expedited Repair of 8-Inch Sewer Main Line
Term Contract
Results
Pinon, AZ 86520

Shadow Mountain Drive Hotel Remodel
Build-out, Infrastructure
Pending Verification
$600,000 CJ est. value
Bellemont, AZ 86015

Kachina Trail Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Flagstaff, AZ 86001

Holiday Inn / Flagstaff
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Flagstaff, AZ 86004

Babbitt Ranch Solar and Storage
New Construction, Infrastructure
Design
$98,000,000 CJ est. value
Williams, AZ 86046

Last Updated 04/06/2023 11:32 PM
Project Title

Soliere Avenue Water Transmission Main Project

Physical Address View project details and contacts
City, State (County) Flagstaff, AZ 86004   (Coconino County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,900,913 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work. Contractor shall furnish any and all labor, materials, equipment, transportation, utilities, services and facilities for the Soliere Avenue Water Transmission Main Project ("Project"). The Project scope is specific to the attached Special Provisions ("Exhibit A"). Contractor shall construct the Project for the Owner in a good, workmanlike and substantial manner and to the satisfaction of the Owner through its engineers and under the direction and supervision of the City Engineer, or his properly authorized agents including but not limited to project managers and project engineers. Contractor's work shall be strictly pursuant to and in conformity with the Contract. General Attachments required. Exhibit C - 7 Bid Schedule needs to be fully filled out and included in the General Attachments Project Type Bid Response Types Line Items General Attachment (required) Type of Award Lump Sum Pre-Bid Meeting No Online Q&A No The Project will involve a full plant shutdown to construct new static mixer vault and provide new static mixer in the raw water piping, remove and replace basin isolation valves, abandon basin tie valves and piping, repair channel trough and remove and replace MCC buckets. The Project will also require a partial plant shutdown in order to demo major mechanical equipment and structural supports and modifications, and provide basin floor sloping, install mechanical equipment, coat channel trough, and provide channel trough covers, and electrical modifications for one basin (Project). This summary is not a comprehensive account of the Project. The plan sets and specifications attached hereto shall be considered a comprehensive detail of the work to be performed . Written requests may be submitted via e-mail to Emily Markel, Acting Purchasing Manager at emarkel@flagstaffaz.gov. Requests for clarifications/questions must be received no later than 3:00 P.M. March 10, 2023.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents