West Hill Springs Water Quality Improvements - City of Auburn
New Construction, Infrastructure
Conception
$480,000 CJ est. value
Auburn, WA 98002

Vegetation Sorting Facility - sdbd12 - City of Auburn
Build-out
Conception
$152,000 CJ est. value
Auburn, WA 98002

Cedar Hills Leachate Lagoon- Lagoon Upgrade
Renovation
Design
$3,500,000 est. value
WA

Sewer Train Upgrades and UV Replacements - City of Duvall
Renovation
Design
$5,717,850 CJ est. value
Duvall, WA 98019

RFQ Engineering - Water Reclamation Facility Improvements - Phase 3
Renovation
Post-Bid
$300,000 CJ est. value
Snoqualmie, WA 98065

Purchase and Repair of PRV (Pressure Relief Valves)
Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Issaquah, WA 98029

MBR Equipment for Train 4
Renovation
Results
Duvall, WA 98019

2022 Lakota Primary Clarifiers and Scum System Improvements
Renovation
Results
$1,600,000 to $2,000,000 est. value
Federal Way, WA 98023

RFP Construction Manager - GC/CM Services for West Point Treatment Plant (WPTP)
New Construction, Infrastructure
Construction
$7,000,000 CJ est. value
Seattle, WA 98199

South Wellfield Improvement Project - City Of Snoqualmie
Renovation, Infrastructure
Conception
$1,745,011 CJ est. value
Snoqualmie, WA 98065

Water Reclamation Facility (WRF) Phase 3 Improvements
Renovation
Post-Bid
$9,400,000 CJ est. value
Snoqualmie, WA 98065

Cougar Mountain 1 Pump Station Rehabilitation
Renovation, Infrastructure
Results
$2,939,670 CJ est. value
Bellevue, WA 98006

Grit Removal System Improvement Project - City Of Snoqualmie
Renovation
Conception
$326,590 CJ est. value
Snoqualmie, WA 98065

Urgent Wastewater Systems Repair Work Order
Infrastructure
Post-Bid
$150,000 CJ est. value
Seattle, WA 98164

Thornton Natural Drainage System
Demolition, Infrastructure
Results
$11,527,200 CJ est. value
Seattle, WA 98164

Last Updated 07/06/2023 03:08 PM
Project Title

RFP Construction Manager - GC/CM Services at West Point Treatment Plant (WPTP)

Physical Address View project details and contacts
City, State (County) Seattle, WA 98199   (King County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The County intends to procure a General Contractor/Construction Manager (GC/CM) team to provide GC/CM services for this programmatic Project. The Project generally includes rehabilitation and replacement of equipment at the WPTP, including improvement of system reliability, upgrade of critical electrical and mechanical equipment and systems and life safety enhancements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents