Similar Projects
HDPE Storm Water Application Pipe
Term Contract
Bidding
Columbia, MO

Swale and Culvert Work
Alteration
Bidding
Saint Peters, MO 63376

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
MO

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
Bethany, MO 64424

Elson Street Culvert Replacement
Results
Kirksville, MO

Corby Pond Restoration
Results
Saint Joseph, MO 64506

Elementary Library Drainage
Infrastructure
Post-Bid
Iberia, MO

Paddock Creek Improved Channel Repair
Results
$597,000 est. value
Chesterfield, MO

Parking Lot Regrading and Drainage Project
Infrastructure
Post-Bid
Gower, MO

Romaine Creek Road - Slope Repair
Infrastructure
Results
$300,024 est. value
Hillsboro, MO

CMP Culvert Replacement
Infrastructure
Post-Bid
MO

Sidewalk and Drainage Improvements
Infrastructure
Results
Saint Charles, MO

Corrugated Metal Pipe Polypropylene Pipe - Southwest District
Infrastructure
Post-Bid
Springfield, MO 65803

Paxton Keeley Elementary Playground Drainage
Infrastructure
Results
Columbia, MO 65203

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Post-Bid

Reported 09/25/2021 12:00 AM
Project Title

Deer Creek Greenway - Deer Creek Park Streambank Stabilization

Physical Address View project details and contacts
City, State (County) Maplewood, MO   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope of work is to stabilize streambank erosion and slope failure occurring at the site with stone toe protection and live staking as method for repair. Location for stabilization of 405 linear feet (lf) is on the left-descending streambank of Deer Creek. Additionally new Stormwater inlets, piping, and outfall structure within Deer Creek Park located in Maplewood, Missouri

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents