Similar Projects
N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

Replace Campus Boilers - Five Buildings
Alteration
Bidding
$850,000 est. value
Alamosa, CO 81101

Boiler Replacement at Remington Building
Alteration
Bidding
Lakewood, CO 80215

AFB 2141 CC 2018 Hail Damage Repairs
Post-Bid
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Rangeview Boiler Replacement
Post-Bid
Aurora, CO 80013

SB267 Replace Boiler Economizer, Central Plant, CMHIP
Results
Less than $40,000 est. value
Pueblo, CO 81003

16" Sleeve Valve and Spool Refurbishment
Results
Berthoud, CO 80513

Water Heater Replacement
Alteration
Bidding
Denver, CO 80228

Greeley Central HS Boiler and DHW Replacements
Post-Bid
Garden City, CO 80631

SB267 Repairs/ Upgrades to Mechanical and Electrical Systems-Three Troop Offices / Adams
Results
$158,200 est. value
Commerce City, CO 80022

Cu Anschutz Pn19-129407-Scpp Pre-Qualified Only
Post-Bid
Less than $220,238 est. value
Denver, CO

Refurbish Hydronic Heat System at Johnson Building
Results
Rangely, CO 81648

Elevator and Conveyance Inspection Services
Post-Bid
Brighton, CO

As-Needed HVAC, Mechanical and Plumbing Services
Term Contract
Results
Aspen, CO 81611

Reported 07/10/2021 12:00 AM
Project Title

Borick Hall Boiler Replacement

Physical Address View project details and contacts
City, State (County) Gunnison, CO   (Gunnison County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The existing high efficiency boilers serving Borick Hall on the Western Colorado University campus are past their serviceable lifespan and must be replaced. Borick Hall is a two story, 23,690sf brick classroom facility built in 2007. The original boilers function poorly and are no longer produced or supported by the current manufacturer. The engineering drawings included herewith illustrate in detail the replacement for the boilers, flues and circulation pumps. The existing mechanical room is conveniently located on the ground level adjacent to a raised concrete platform with easy vehicular access.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents