Similar Projects
Grade, Drain and Surface - SH 152
Infrastructure
Design
$13,000,000 CJ est. value
Minco, OK 73059

Grade, Drain and Surface - SH 152
Infrastructure
Design
$13,000,000 CJ est. value
Minco, OK 73059

Drainage Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Amber, OK 73004

Sanitary Sewer Main Replacement
Infrastructure
Post-Bid
$400,000 CJ est. value
Chickasha, OK 73018

Slabjacking and Subsealing Services
Infrastructure
Results

Pavement Rehabilitation (Dbr/Diamond Grind) H.E. Bailey Turnpike: from M.P. 62.0 Extend Northeast To M.P. 78.0
Infrastructure
Results

Grade, Drain and Surface - SH 152
Infrastructure
Design
$13,000,000 CJ est. value
Minco, OK 73059

Rush Springs Public Schools - Playground Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Rush Springs, OK 73082

Right-of-Way Clearance - Sh-19
Infrastructure
Results
OK

Grade, Drain, Bridge and Surface - OK 19
Infrastructure
Design
$30,321,155 CJ est. value
Ninnekah, OK 73067

Resurface (Asphalt) From SH-37
Infrastructure
Results
OK

Grade, Drain, Bridge and Surface - SH 19
Infrastructure
Design
$10,971,041 CJ est. value
Ninnekah, OK 73067

Resurface (Asphalt) US-81
Infrastructure
Results
OK

Interchange - US 81
Infrastructure
Design
$33,651,000 CJ est. value
Chickasha, OK 73018

Access Road - Grady Co. #7
Infrastructure
Results
OK

Last Updated 03/14/2023 05:31 AM
Project Title

Bridge and Approaches - US 277

Physical Address View project details and contacts
City, State (County) Chickasha, OK 73018   (Grady County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected January 2026
Bids Due View project details and contacts
Estimated Value $4,500,356 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us 277: Over Smith Creek 2.7 Mis. W. Of Us 81. As of March 14, 2023, the project is in Design status. Anticipated letting month/year is May, 2025. Length : 0.200 Mi. OKDOT - Bridge and Approaches - US 277 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents