Similar Projects
Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Hospital Channel - Yucca Valley
Infrastructure
Conception
$5,901,359 CJ est. value
Yucca Valley, CA 92284

North System North Trunk (NSNT) Sewer Siphon Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Chino, CA 91710

Redlands Mall Development
New Construction, Renovation - 84,106 SF
Design
$275,000,000 est. value
Redlands, CA 92373

RFP Design - Design Services for New Police Department
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Victorville, CA 92395

Construction of Simulation Center
New Construction, Infrastructure - 70,000 SF
Bidding
$100,000,000 CJ est. value
Fort Irwin, CA 92310

O'Reilly Auto Parts #2 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

Runway Rehabilitation and Connecting Taxiways Program at Ontario International Airport
Infrastructure
Results
Ontario, CA

Stanfield Cutoff Restroom Site Preparations Project
Infrastructure
Results
$300,000 est. value
Big Bear Lake, CA

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

IKEA / Ontario
New Construction, Infrastructure - 329,850 SF
Pending Verification
$35,000,000 CJ est. value
Ontario, CA 91764

San Bernardino County Transportation Tunnel
New Construction, Infrastructure
Pending Verification
$492,000,000 CJ est. value
Rancho Cucamonga, CA 91730

Dupont Avenue Pavement Rehabilitation - City of Ontario
Infrastructure
Conception
$195,000 CJ est. value
Ontario, CA 91761

Starbucks and Burger King #4974 / Barstow
Demolition, New Construction, Infrastructure - 5,550 SF
Design
$1,700,000 CJ est. value
Barstow, CA 92311

Last Updated 09/02/2022 04:32 AM
Project Title

Runway 26R ILS Upgrade Project at Ontario Internatonal Airport

Physical Address View project details and contacts
City, State (County) Ontario, CA 91761   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,250,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

MH Project No: 1512800-210633.01 Project at Ontario International Airport Authority has been rejected. OIAA intends to re-advertise this project very soon The scope of work for this Project consists of demolishing the existing approach light system and constructing a new ALSF2 system. This is an airside project, with all improvements within the secure AOA perimeter of the Airport. All ONT badging, access, and driver safety requirements must be met as part of the scope. Requests for Information (RFI): Bidders may request, in writing, information, a clarification or interpretation of any aspect of the NIB Documents. All Requests for Information (RFIs) must be submitted electronically and received no later than Tuesday, June 14, 2022, @ 5:00 p.m., (PDT). Per Public Works Contractor Registration Law [SB 854], Contractors and Subcontractors who intend to submit a proposal or work on this Project must be registered with the Department of Industrial Relations at: electronically.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents