Last Updated 01/04/2021 12:21 PM
Project Title

Lead Service Line Replacement- Phase 2C-Ewing and Lawrence

Physical Address View project details and contacts
City, State (County) Trenton, NJ 08608   (Mercer County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of trenchless replacement of 1,200 lead or galvanized steel lines for residences within the Townships of Ewing and Lawrence, from the water main to the water meter in the home. Work will generally include coordination with the homeowner, verification of water service line material inside the home and at the curb stop, excavation, removal or abandonment of existing service line, installation of copper service line, curb stop and box, ball valves, testing, flushing, backfill, soil erosion and sediment control, traffic control, housekeeping, full restoration to existing conditions including landscaping, sidewalks, curbs, paving, striping, data management in ArcGIS and other tasks to complete the work. Work may require dewatering and trench shoring.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents