Similar Projects
100 N. Broadway
New Construction, Infrastructure - 331,863 SF
Design
$70,000,000 CJ est. value
Aurora, IL 60505

Timber Trails Subdivision Paving
Infrastructure
Post-Bid
Gilberts, IL

HMA Surface Removal and Replacement
Infrastructure
Post-Bid
Gilberts, IL

2021 MFT and Infrastructure Road Program
Results
Less than $2,965,600 est. value

Waubonsee Creek Shared Use Path
Infrastructure
Results
Montgomery, IL

Cemetery Services
Term Contract, Alteration
Post-Bid
Geneva, IL 60134

Windmill Cove Directional Boring and Cable Replacement
Infrastructure
Results
Batavia, IL

2022 Annual City Landscaping Repair and Maintenance
Term Contract, Infrastructure, Alteration
Post-Bid
Aurora, IL

Civic Center Parking and Streetscape Improvements
Infrastructure
Results
South Elgin, IL

EASD Site Improvements 2022
Infrastructure
Post-Bid
Aurora, IL 60505

McCoy/5th Avenue and Kautz Road Intersection Improvement
Infrastructure
Results
Aurora, IL 60505

Washington Park Playground
Renovation
Post-Bid
Batavia, IL 60510

Childcare Playground Surface
Renovation
Results
$70,000 est. value
Elgin, IL

2022 Combined Sewer Overflow Structure Rehabilitation
Infrastructure
Post-Bid
$440,000 CJ est. value
South Elgin, IL 60177

Playground Equipment Design and Installation
Renovation
Results
Aurora, IL 60505

Last Updated 04/13/2023 01:04 PM
Project Title

Timber Trails Park Redevelopment - Saint Charles Park District

Physical Address View project details and contacts
City, State (County) St Charles, IL 60174   (Kane County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Golf Course, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2020
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

An 18-hole disc golf course winding through existing meadows and woodlands. Four outdoor pickleball courts next to midlevel fitness equipment. A new parking lot providing access to an entirely reconstructed playground. Some of the most innovative components of a preliminary plan to redevelop Timber Trails Park in St. Charles also were the most controversial among dozens of residents who attended a community engagement session this week. The St. Charles Park District has been working for months to develop proposed improvements for the 36-acre park tucked between a business park and residential neighborhoods at the north end of 17th Street. To help fund the project, officials applied for a matching $400,000 grant in August through the state's Open Space Land Acquisition and Development fund program. The goal is to provide new types of amenities desired by residents while also enhancing the park's existing features, such as a sled hill, picnic shelters, fields and eight-tenths of a mile of trails As of October 31, 2019, the amenities in this project are proposed. The park district plans to incorporate results from a survey into the development of a final master plan, which is expected to be completed by the end of 2019. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Lockers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 22 - Plumbing, Facility Sanitary Sewerage, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Clearing and Grubbing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Turf and Grasses, Plants, Planting Accessories.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Utility Water Drains, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents