Similar Projects
Annual and Semi-Annual HVAC Chiller Maintenance Service
Bidding
Charleston, SC 29412

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Storm Eye Institute Chiller Replacement - Phase II
Post-Bid
$2,000,000 to $3,000,000 est. value
Charleston, SC

Coastal Center-HVAC Replacement at Hillside Dorm 520
Results
$150,000 to $200,000 est. value
Summerville, SC

Coastal Center - HVAC Replacement at Highlands 510
Results
$400,000 to $500,000 est. value
Summerville, SC

MUSC HCC 4th Floor Mechanical Room Cooling
Post-Bid
Less than $100,000 est. value
Charleston, SC

SCDMH Charleston Mental Health Chiller Replacement
Results
$130,000 to $180,000 est. value
Charleston, SC 29414

Statewide Indefinite Delivery Contract for Mechanical / Plumbing Construction Services
Post-Bid

5 Ton Leibert Split System Replacement
Results
Charleston, SC 29412

Repair Maintenance Facility Building 536
Post-Bid
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

Provide and Install Two 10 Ton HVAC Units on TTC Berkeley Campus
Term Contract
Results
Moncks Corner, SC 29461

Air Duct Cleaning Equipment
Post-Bid
Charleston, SC 29425

Heat Pumps / Air Conditioners for Liberty, George and Mcalister Hall - Similar 1
Results
Charleston, SC

Basic Science Building Rooftop Exhaust Fans Replacement (Non-Strobic)
Post-Bid
Less than $250,000 est. value
Charleston, SC

J--Test, Adjustment and Balance of Various HVAC Systems
Results
Charleston, SC 29401

Last Updated 06/10/2019 07:25 AM
Project Title

Preventative Maintenance for Chiller and Major Mechanical System Equipment

Physical Address View project details and contacts
City, State (County) Charleston, SC   (Berkeley County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Furnish labor, equipment, and materials to perform scheduled and “on-call, as-needed” shutdowns, operational checks, scheduled preventive maintenance and mechanical repairs for College of Charleston chiller and major mechanical system equipment.
Details
Division 02 - Existing Conditions, Physical Decontamination, Mechanical Filtration Decontamination.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment, Humidity Control Equipment, Mechanical Dehumidification Units.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents