Similar Projects
RFP D/B - SR 70 from Lorraine Road to Bourneside Boulevard, Manatee County
Infrastructure
Bidding
$71,669,608 CJ est. value
Bradenton, FL 34202

Central District S-949A Electrical Distribution Building 2
New Construction, Infrastructure
Bidding
$139,644,880 CJ est. value
Key Biscayne, FL 33149

Ackerman Vacuum Sewer Zones 1 And 2 – Plumbing Contract 2
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Port Charlotte, FL 33952

Justice Center Tower Plumbing Replacement
Renovation
Post-Bid
Fort Myers, FL 33901

Plumbing Services
Term Contract, Alteration
Post-Bid
Jacksonville, FL

Sources Sought - GSA, Region 4, Tampa, Design-Build Closed Loop Side Stream Filtration System, Water Source ACS and Piping Replacement
Results
$250,000 to $500,000 est. value
Tampa, FL

Commercial Plumbing Service and Fire Sprinkler Repair and Parts Services
Alteration
Results
Orlando, FL

Rigid Pavement Rehabilitation/ Milling and Resurfacing
Infrastructure
Bidding
$23,797,300 CJ est. value
St Petersburg, FL 33713

Cady Way Pool Filter
Alteration
Post-Bid
Winter Park, FL

Continuing Plumbing Projects on a Task Authorization Basis
Term Contract, Alteration
Results
Kissimmee, FL

Wauchula Hills Phase 7.0 Water And Sewer Improvements
Infrastructure
Bidding
$1,000,000 CJ est. value
Wauchula, FL 33873

Miami-Dade College - Kendall Campus Building N Makers Lab - Interior Renovations & Mep
Renovation, Demolition, Alteration
Post-Bid
Miami, FL 33176

Plumbing Services for USF
Alteration
Results
Saint Petersburg, Sarasota, Tampa, FL 33620

Hot Water Plumbing - 4th Floor At The Hyatt Regency Orlando International
Alteration
Post-Bid
Orlando, FL 32827

Plumbing Services
Term Contract, Alteration
Results
FL

Last Updated 05/05/2023 03:31 AM
Project Title

Golden Gate City Transmission Water Main Improvements - Phase 1B

Physical Address View project details and contacts
City, State (County) Naples, FL 34112   (Collier County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $13,983,980 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation of new transmission water main, force mains and IQ mains within the SW & SE quadrants of Golden Gate City. Q & A deadline: Apr 10, 2023 5:00:00 PM EDT Contract duration: 600 days The COUNTY requires the work to be performed along 29th Place SW as detailed and shown on the Plans in Sheets 24, 24(X), 24A, 24A(X), and 24B shall be completed first in order to avoid conflicts with other projects in the area. The Work includes: 1. Furnishing of all labor, material, superintendence, plant, power, light, heat, fuel, water, tools, appliances, equipment, supplies, services and other means of construction necessary or proper for performing and completing the Work. 2. Sole responsibility for adequacy of plant and equipment. 3. Maintaining the Work area and site in a clean and acceptable manner. 4. Maintaining existing facilities in service at all times. 5. Protection of finished and unfinished Work. 6. Repair and restoration of Work or existing facilities damaged during construction. 7. Furnishing as necessary proper equipment and machinery, of a sufficient capacity, to facilitate the Work and to handle all emergencies normally encountered in Work of this character. 8. Furnishing, installing, and protecting all necessary guides, track rails, bearing plates, anchor and attachment bolts, and all other appurtenances needed for the installation of the devices included in the equipment specified. Make anchor bolts of appropriate size, strength and material for the purpose intended. Furnish substantial templates and shop drawings for installation. C. Implied and Normally Required Work: It is the intent of these Specifications to provide the COUNTY with complete operable systems, subsystems and other items of Work. Any part or item of Work, which is reasonably implied or normally required to make each installation satisfactorily and completely operable, is deemed to be included in the Work and the Contract Amount. All miscellaneous appurtenances and other items of Work incidental to meeting the intent of these Specifications are included in the Work and the Contract Amount even though these appurtenances may not be specifically called for in these Specifications. D. Quality of Work: Regard the apparent silence of the Contract Documents as to any detail, or the apparent omission from them of a detailed description concerning any Work to be done and materials to be furnished as meaning that only the best general practice is to prevail and that only materials and workmanship of the best quality are to be used. Interpretation of these specifications will be made upon this basis.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents