Similar Projects
Brookfield Elementary School Renovations
Renovation
Conception
$38,721,113 est. value
Chantilly, VA 20151

Sangster Elementary School Renovations
Renovation
Conception
$45,008,590 est. value
Springfield, VA 22153

Briar Woods High School Classroom Addition
Addition
Post-Bid
Ashburn, VA 20148

Memorial Avenue Pylon Project
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Arlington, VA 22246

Tennis Court
Results
Danville, VA 24541

Modular Relocation Project at Kilmer Middle School
Renovation
Results
$1,000,000 to $2,999,999 est. value
Vienna, VA 22182

Development, Design and Construction of a New High School
New Construction - 257,800 SF
Construction
$85,674,472 est. value
Harrisonburg, VA 22801

Waxpool Crossing
New Construction - 17,000 SF
Construction
Ashburn, VA

Elementary School Renovations
Renovation
Conception
$25,000,000 est. value
VA

Sprouts
New Construction, Infrastructure - 25,750 SF
Post-Bid
$10,000,000 CJ est. value
Manassas, VA 20109

Serving Line Renovation at Osbourn High School
Renovation - 1,574 SF
Results
Manassas, VA 20110

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23325

Construction on the Potomac-Yard Four Mile Run Trail Connection
Renovation
Results
VA

Renovate Various Cabins at Fairy Stone State Park
New Construction, Renovation - 17,572 SF
Results
Stuart, VA 24171

Architectural and Engineering Services for Hermitage and Highland Springs ACE Centers
New Construction, Renovation
Results
Less than $53,000,000 est. value
Henrico, VA 23228

Last Updated 09/29/2022 08:10 AM
Project Title

RFQ Contractor - Synthetic Turf Field Installation Projects

Physical Address View project details and contacts
City, State (County) Falls Church, VA 22046   (Falls Church City County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Fairfax County Public Schools competitively bids synthetic turf field installation projects. These projects include all required site excavation, underground utilities, sub-base preparations and installations, complete synthetic turf field installations including field accessories and equipment. These projects range in value from approximately $300,000 to $3,000,000. Only prequalified Contractors may submit bids. The term Contractor in this application for Synthetic Turf Field Installation Projects, is referred to the synthetic turf field installation contractor. Contractors interested in bidding on these projects shall submit a prequalified application. Prequalification applications for synthetic turf field installation projects are accepted, as an ongoing basis with surety updates every two years, from interested and qualified Contractors The Prequalification Application shall be submitted electronically to Turfprequalification@fcps.edu no later than 60 days prior to an established bid opening as advertised onportal, use the search function and search Design and Construction Services Current Solicitations. Comments and questions concerning the scope of work and the overall projects should be addressed in writing via email to Matthew Wright, mbwright1@fcps.edu Questions about the prequalification application shall be addressed to Katy Knoll, senior buyer at 571-423-2279 or email at kknoll1@fcps.edu.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents