Similar Projects
Last Updated 05/26/2021 04:05 PM
Project Title

SPA 1 Recharge Expansion CMAR

Physical Address View project details and contacts
City, State (County) Surprise, AZ 85379   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be located at the City’s Special Planning Area 1 (SPA 1) Water Reclamation Facility, specifically 13665 West Cactus Road, Surprise, Arizona 85379 and the Bell Road Lake 15105 West Bell Road, Surprise, Arizona 85374. The SPA 1 Water Reclamation Facility is the City’s primary wastewater treatment plant that processes 10 M gallons of wastewater per day. This campus currently operates 11 existing vadose zone wells. The Bell Road lake location is a City owned parcel adjacent to an existing lake, well, and residential/commercial development. The City of Surprise is seeking a Construction Manager at Risk for the pre-construction and construction phase services associated with the completion of up to (7) vadose zone recharge wells. The installation of these wells and the associated infrastructure will aid in the City’s strategic plan of recharging effluent water in our area of hydrologic impact. This project will install two (2) vandose zone wells at the City’s South Water Reclamation Facility and five (5) vadose wells at Bell Road Lake. The City is currently working with Brown & Caldwell for the plans, specifications and estimates associated with this improvement project. The design is currently 60% complete and has been attached to this solicitation as a reference. Brown and Caldwell is also contracted for limited construction administration and SCADA programming. The permitting associated with establishing an Underground Storage Facility has been completed at both locations. Some of the challenges that we foresee with the project will be the proximity to neighbors at the Bell Road Lake, utility coordination, soil conditions at the SPA 1 Water Reclamation Facility and coordinating work at two sites.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents