Similar Projects
First United Methodist Church
New Construction, Infrastructure - 10,986 SF
Design
$600,000 CJ est. value
Dekalb, IL 60115

Roadway Improvements
Infrastructure
Post-Bid
Dekalb, IL 60115

Mason Court Sidewalk Replacement
Infrastructure
Post-Bid
De Kalb, IL

Twombly Resurfacing
Infrastructure
Results
$1,107,584 est. value
Dekalb, IL 60115

Twombly Resurfacing
Infrastructure
Results
$1,107,584 est. value
Dekalb, IL 60115

RFQ Design - Construct Northern Illinois Center for Community Sustainability
New Construction, Infrastructure - 30,000 SF
Pending Verification
$15,000,000 CJ est. value
Dekalb, IL 60115

Fisk Avenue Multi-Residential Development
Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Dekalb, IL 60115

Aluminized PC, Type 1, Various Size - Total 2112 Feet / Aluminized PC, Type 1, Connecting Band - Total 29 Each.
Infrastructure
Post-Bid
De Kalb, IL

Chicago Road HMA Overlay
Infrastructure
Results
Dekalb, IL

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Afton Road
Infrastructure
Results
Sycamore, IL 60178

Milling and Resurfacing 3.75" on Il 38 From W. of John Huber Huber Pkwy to 5th St
Infrastructure
Post-Bid
$2,000,000 est. value
IL

2021 Microsurfacing
Infrastructure
Results
Sycamore, IL

Lincoln Highway (IL Route 38)
Infrastructure
Post-Bid
$450,000 est. value
Dekalb, IL 60115

Resurfacing, Sidewalk Replacement, Curb and Gutter, Pavement Markings and Pedestrian Signal Improvements
Infrastructure
Results
De Kalb, IL

Last Updated 12/06/2022 07:38 PM
Project Title

Proposed Site Improvements at the Milestone Dog Park

Physical Address View project details and contacts
City, State (County) Sandwich, IL 60548   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $152,629 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 06, 2022, bids received were rejected as they were over the budget. Project will rebid spring of 2023. Sandwich Park District is accepting sealed bids for the proposed site improvements at the Milestone Dog Park located at the northeast corner of Fairwind Boulevard & Pleasant Avenue in Sandwich, Illinois. Work includes removal and replacement of concrete sidewalk, general excavation and grading of the site, installation of water service & drinking fountain, installation of proposed asphalt parking area, parking bumpers, striping & signage, concrete paths and building pads, brick memorial area, installation of topsoil and seeding disturbed areas and 4' chain link fence and gates. Areas of work are detailed in the Civil Site Plans prepared by Tebrugge Engineering, 410 E. Church St, Sandwich, IL, 815-786-0195. All work shall be completed by May 31, 2023. Performance Bond Requirements The contractor shall furnish a Performance Bond and a Labor and Material Payment Bond for the full amount of the Contract. Such Bond shall be in force from the date of signing of the Contract until one (1) year after issuing of final Certificate for Payment. The cost thereof shall be included in the Contract Sum. The amount of each bond shall be equal to 100 percent of the Contract Sum. The bond surety must carry a BEST RATING of A. Insurance The Contractor shall maintain, at its own expense, the following insurance coverages, insuring the Contractor, its employees, agents, and designees. The Owner and the Engineer shall be named as additional insured on the comprehensive general liability and umbrella liability insurance policies. All property damage liability insurance must be on a replacement coverage basis and also include actual expenses incurred on the loss of use of any such tangible personal property. The insurance shall be placed with insurance companies rated at least A by Best's Key Rating guide or with other insurance companies acceptable by the Owner at least thirty (30) days prior to the cancellation, nonrenewal, or reduction in limits of liability by endorsement, change in deductible per claim, or change in limits of exclusion of any such policies. Commercial General Liability Insurance: General Aggregate Limit$1,000,000 Products-Completed Operations Aggregate Limit$1,000,000 Personal and Advertising Injury Limit$1,000,000 Each Occurrence Limit$1,000,000 Fire Damage Limit$ 50,000 Medical Expense Limit$ 5,000 Owner, it's officers and administrators and the Engineer and its consultants shall be named as additional insured. Workers Compensation: Statutory Employers Liability Bodily Injury by Accident Each Accident$ 500,000 Bodily Injury by Disease$ 500,000 Policy limit Bodily Injury by Disease$ 500,000 Each employee Auto Liability: Including Owned, Non-Owned and Hired Autos Combined Single Limit$1,000,000 Umbrella Liability: Limit of Liability$2,000,000 Retained Limit$ 10,000 Prevailing Wage All contracts for work herein are subject to all Park District rules and regulations and providing for the payment of DeKalb County,s prevailing wage rate to all workers involved in these projects. Sandwich Park District reserves the right to reject any or all proposals, to waive or not to waive any informalities therein or to accept the proposal considered to be in the best interest of the sandwich Park District.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents