Similar Projects
Lowe House - Grounds, Drainage, and Pavement Repairs and Improvements
Bidding
Huntsville, AL 35899

Stickney Reservoir Improvements
Bidding
Mobile, AL

Gibbs Village East and West Erosion Control/Sidewalk Improvements
Post-Bid
Montgomery, AL

6th Avenue Drainage Project
Post-Bid
Less than $2,500,000 est. value
Birmingham, AL 35203

2018 Neighborhood Improvements
Results
Haleyville, AL 35565

McDuffie Bulkhead Replacement
Results
Mobile, AL

Street and Drainage Rehabilitation for the East Lake Community
Bidding
Guntersville, AL

Design and Construction of a Slope Failure Repair
Post-Bid
Scottsboro, AL

Star Lake Improvements
Results
$250,000 to $400,000 est. value
Hoover, AL 35216

Guntersville East Lake Community Street and Drainage Rehabilitation
Bidding
$483,000 est. value
Guntersville, AL

Azalea City Golf Course - Grading and Drainage Improvements
Post-Bid
Mobile, AL 36608

Showa-Best Glove - Plant Expansion
Results
Less than $550,000 est. value
Fayette, AL

Simmons Street Drainage Replacement
Bidding
$1 to $180,000 est. value
Elba, AL 36323

Gulf of Mexico Artificial Reef Construction Project
Post-Bid
Gulf Shores, AL 36457

Bethel Avenue and Georgia Street Capping and Drainage Improvement Project
Results
Tarrant, AL

Last Updated 04/14/2020 03:18 PM
Project Title

Runway 24 Glide Slope Terrain Improvements

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35212   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the grading and drainage improvements inside the Glide Slope Critical Area east of Runway 24 at Birmingham Shuttlesworth International Airport in Birmingham, AL. The scope of work generally includes the installation of approximately 35,000 CYD of borrow material to fill in existing drainage swales, removal of existing stone rip rap and concrete ditch pavement, installation of Class V round drainage pipes, installation of new drainage structures including a large cast-in-place junction structure, general smoothing of grades inside the Glide Slope Critical Area, installation of topsoil and seeding in areas disturbed by grading, and all associated erosion and sedimentation control measures.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents