Similar Projects
Murphy Oil #7092/7845 / Lapeer
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$2,000,000 CJ est. value
Lapeer, MI 48446

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

M-24 Castle Road to Millington Road
Results
Lapeer, MI

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Road Repair - Skip Paving, HMA
Infrastructure
Results

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Tubspring Road - Overlay
Infrastructure
Results
MI

Bituminous Seal Patch
Infrastructure
Post-Bid
Lapeer, MI

Peppermill Road Overlay- Wilder Road to Five Lakes Road
Alteration
Results
Lapeer, MI

Bid Package 8 Imlay City Middle School Paving
Infrastructure
Post-Bid
Imlay, MI

Overband Crack Seal Various Locations
Alteration
Results
Lapeer, MI

Up to 196.32 Lnmi of Hot Mix Asphalt Crack Treatment
Infrastructure
Post-Bid

M-24 North of Mayfield Road to North of Saginaw Street
Infrastructure
Results
Lapeer, MI 48446

Last Updated 10/17/2022 12:38 PM
Project Title

RFP Engineering - Professional Engineering and Survey Design Services Grade, Base, and Drainage Koylton Township

Physical Address View project details and contacts
City, State (County) Clifford, MI 48727   (Lapeer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 17, 2022, information regarding the award and award date has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: To hire a qualified professional engineering firm to provide necessary survey and design work for a grade, base, and drainage project. The intent of the project is to center the roadway on the section line, widen the roadway to the standard cross section, (Grade) improve the base of the roadway, (Base) and provide positive drainage (Drainage). This includes performing all surveying, design, permitting, and design necessary for a completed project as detailed below, along with deliverable of the electronic CAD file, associated special provisions and plans. All survey work will be completed under the supervision of a Professional Surveyor licensed in the State of Michigan. All design work shall be completed in accordance with MDOT and AASHTO design criteria. This work shall be completed under the direct supervision of a Professional Engineer licensed in the State of Michigan and the plan set is to be certified by that Professional Engineer. The final design shall be approved by the Tuscola County Road Commission. Any questions shall be directed to Brent Dankert at 989-233-7472 or highwayengineer@tuscolaroad.org. Livermore Road from English Road to Phillips Road, Koylton Township, 0.98 miles of grade, base, and drainage. Project includes a section of right of way clearing, hill cut, and road widening in addition to the grade, base, and drainage. Any variation from the specifications of the project herein without written approval from the Tuscola County Road Commission and/or its authorized representative may result in, at the discretion of the Tuscola County Road Commission, the voiding and/or canceling of the acceptance of any contract, resulting from this project. The Tuscola County Board of Road Commissioners reserves the right to accept or reject any or all proposals and to re-advertise or to accept the proposal, that in their opinion, is in the best interest of Tuscola County. The method of contractor selection has not been determined at this time

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents